£13,379
Aircraft Location:Conroe, Texas, USA
Seller Information
View Seller InformationGeneral
Year
1955
Manufacturer
Model
Serial Number
D-4197
Registration #
N4228B
Condition
Used
Based at
CXO
Description
Project Plane! Big Price Drop! A blockage in the crankcase vent caused crankcase pressurization and oil flow disruption, resulting in multiple engine component failures; the Continental E-225-8 engine will require further teardown and likely an IRAN or overhaul. The current owner elected not to pursue the repair, creating an opportunity for a buyer to restore and return this classic V-tail Bonanza to service. This 1955 Beechcraft F35 Bonanza (N4228B), located at Conroe, TX (KCXO), is being offered as a project aircraft with 8,006 hours total time and complete logbooks.
Airframe
Total Time
8,006
Useful Load
420.48 kg
Complete Logs
Yes
Engine
Engine 1 Make/Model
CONTINENTAL E225-8
Engine Serial Number
35302-D-5-8
Engine Horsepower
167.78 kW
Engine 1 Time
571 SMOH
Engine TBO
1500
Props
Prop Manufacturer
HARTZELL
Prop Model
HC-A2V20-41A
Prop Time
620 SMOH
Number of Blades
2
Blade Composition
Aluminum
Avionics
ADS-B Equipped
Yes
Avionics/Radios
Sigma Tek 40000B-30 Directional Gyro
Garmin GDL82 ADS-B Out
Bendix KT76A Transponder
Ameri-King ELT
Additional Equipment
Additional Equipment
Single Swing-Over Yoke
Great Lakes Aero Products Cabin Door Window
Beech Large Third Window Kit
Exterior
Year Painted
1978
Exterior
Colors: White, Brown & Orange
Interior
Number of Seats
4
Interior
Number of Seats: 4
Folding Lie-Flat Back Seat
Inspection Status
Inspection Status
Project Plane!
History:
Complete Logs
Nose & fuselage repaired October 1961
Inspection Status:
Most Recent Annual: January 6, 2025
IFR Checks: Due November 2026

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

