£197,313
Aircraft Location:Lake Ozark, Missouri, USA
Seller Information
View Seller InformationGeneral
Year
2002
Manufacturer
Model
Condition
Used
Registration #
N702cc
Description
2017 Overhauled Airframe | Factory Lycoming Crate Engine | Fresh Annual | Ready to Fly
This aircraft has been exceptionally maintained and is fully airworthy, turn-key, and ready for immediate pickup.
Highlights
- 2017 Airframe Overhaul completed at 2,191 hours
- Approximately 590 hours remaining until next overhaul
- 2019 New Lycoming Certified Factory Crate Engine installed
- 1,610 hours remaining on power plant
- March 2026 Fresh 100-Hour / Annual Inspection
- 2026 Brand New Tail Rotor Installed
- Includes Dual Handling Wheels
- Complete logbook documentation available upon request
Powerplant & Mechanical
- 2019 Factory replacement Lycoming engine professionally installed at 3344 hours.
- All engine accessories either:
- Newly rebuilt, or
- Newly overhauled
- Aircraft has been consistently maintained with strong maintenance history
Airframe Notes
- Airframe overhaul completed in 2017
- Clean, well-maintained aircraft
- Tail rotor replaced in 2026
- Aircraft is currently airworthy and ready for pick up
- Additional records, logs, and maintenance documentation available upon request.
Aircraft is air worthy and ready for pickup!
Airframe
Total Time
3,801
Airframe Notes
2017 Airframe OH at 2191 Hours - 590 hours remaining till overhaul
2019 Engine New Lycoming Factory Replacement - At 3344
All engine accessories newly rebuilt or newly overhauled.
2026 new tail rotor install
Engine
Engine 1 Time
357 SNEW
Engine TBO
1500
Engine Notes
Remaining time on engine 1840
Avionics
ADS-B Equipped
Yes

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

