Call for price
Aircraft Location:Guernsey, England, United Kingdom
Seller Information
View Seller InformationGeneral
Year
1996
Manufacturer
Model
Serial Number
BB-1518
Condition
Used
Registration #
G-MEGN
Based at
CWL
Description
New To Market
Undergoing Fresh Propeller and Landing Gear Overhaul
Fresh Phase 3 Inspection in Progress
Available Immediately
Airframe
Total Time
13,250
Engine Program
Engine Specs
Engines (PT6A-42)
Manufacturer's Serial Number: PCE-94772| PCE-94771
Engines Total Time Since Overhaul:
Left Engine: 3394.9 Hours /2355 Cycles
Right Engine: 3521 Hours /2423 Cycles
Time Until Hot Section:
LH Engine: 362.70 RH Engine: 362.70
Engine 1
Engine 1 Make/Model
PRATT & WHITNEY PT6A-42
Engine 1 Time
3,394.9 SOH
Engine 1 TBO
3600
Props
Number of Blades
3
Prop Specs
Propellers (PN – Hartzell – HC-B3TN-3N)
Left Propeller: S/N: BUA25769
Total Time: 0 currently being overhauled
Right Propeller: S/N: BUA25770
Total Time: 0 currently being overhauled
OH Next Due: April / May 2031 or 16750.3 hrs.
Avionics
Avionics/Radios
ADF: Collins ADF-60A
ADS: Collins ADS-65
AHS: Collins EFD-85
COMM RADIOS: Dual Collins VHF-22
CVR: Loral Fairchild S100-0080-00
DCP: Collins DCP-85E/G
DME: Dual Collins DME-42
EFIS: L3 Harris PS-835C
ELT: Kannad 406 AP
FDS: Collins 85B-3
GPS #1: UNS 1013-42 Series
GPS #2: Garmin GTN 625
MFD: Collins MFD 85B
NAV RADIO: Collins VIR-32
RADAR ALT: Collins ALT-50A
TRANSPONDER:
#1 Garmin GTX 345R
#2 Collins TDR-94
Exterior
Exterior
Matterhorn White overall, with Red and Blue Stripe.
Interior
Interior
Standard King Air interior. 7 PAX Seat Layout. New interior 2025.
Inspection Status
Inspection Status
Phase 1 Completed June 2025
Phase 2 Completed October 2025
Phase 3 In Progress
Phase 4 Completed October 2024

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

