£438,625
Aircraft Location:Missoula, Montana, USA
Seller Information
View Seller InformationGeneral
Year
1996
Manufacturer
Model
Serial Number
4636034
Registration #
N88RA
Condition
Used
FlightRules
IFR
Based at
KMSO
Description
This is one of the best looking Piper Mirage's money can buy. For the best there isn't a better one on the market. The current owner is extremely meticulous with its care, practicably cleaning it every time it flies. From an updated beautiful leather interior to an updated top of the line Garmin instrument panel. Don't miss the opportunity to get this amazing machine!
Airframe
Total Time
1,936
Basic Empty Weight
574.25 kg
Airframe
The paint is in phenomenal condition. The white/Blue/grey paint scheme turns heads on every ramp. No Damage History, New Pressurization Seals, New 02 Senders, New Fuel Senders, New Prop Governor.
Engine
Engine 1 Make/Model
LYCOMING TIO-540-AE2A
Engine 1 Time
1,936 SFRM
Engine TBO
2000
Turbocharged
Yes
Turbonormalised
Yes
Props
Prop Time
1398 SNEW
Number of Blades
4
Avionics
Primary Flight Display 1 Manufacturer
GARMIN
Primary Flight Display 1 Model
G500 TXI
GPS 1 Manufacturer
GARMIN
GPS 1 Model
GTN 750XI
GPS 2 Manufacturer
GARMIN
GPS 2 Model
GTN 650XI
Transponder 1 Manufacturer
GARMIN
Transponder 1 Model
GTX330
Transponder 2 Manufacturer
GARMIN
Transponder 2 Model
GTX330
Autopilot Manufacturer
BENDIX/KING
Autopilot Model
KFC150
ADS-B Equipped
Yes
WAAS
Yes
LPV
Yes
SVT
Yes
Terrain Warning System
Yes
Avionics/Radios
The current owner has also updated the Garmin EFIS.
Additional Equipment
Pressurised
Yes
Flight Into Known Icing (FIKI)
Yes
Inspection Status
Inspection Status
Last Annual Performed Mar. 2026
Airworthy
Yes

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

