£179,120
£179,120 + GST = GBP £205,988 (GST applies to buyers in New Zealand)
Aircraft Location:Hamilton Airport, New Zealand
Seller Information
View Seller InformationGeneral
Year
1964
Manufacturer
Model
Serial Number
206-0148
Condition
Used
Description
A simple yet classic example of a 206 workhorse.
Currently in Skydive Configuration, and with a Freshly Rebuilt Engine that has not even been yet!
We are in the final stages of refurbishment, which could be completed with in weeks once we know what the preferred configuration is.
Aircraft is Hangered at a Private Hangar in Auckland, New Zealand.
*Price is Plus GST if Applicable
Airframe
Total Time
7,800
Complete Logs
Yes
Engine
Engine 1 Make/Model
CONTINENTAL IO520F9BN
Engine 1 Time
0 SFRM
Engine TBO
1700
Engine Specs
IO520F9 - 0.0hrs
Freshly Rebuilt Engine - Not run yet
Props
Prop Manufacturer
MCCAULEY
Prop Model
D2A34C58
Number of Blades
2
Prop Specs
McCauley 2-Bladed Prop - Going through 5yr Inspection/Refurb
Modifications/Conversions
Modifications/Conversions
PARA-NAUTICS Inflight roll-up Door and External Assist Handles (STC# SA1591NM)
HSL/MOD/019 Camera Mod
Pilot Boarding Handle
Hooker Harness (STC# SA1515GL)
Original Doors to Come with Aircraft
Avionics
Avionics/Radios
Appaero ADS-B Transponder
Garmin G3X Electronic Flight Instrument System
King KY97A VHF
PM1000 II Audio Panel
Kannad 406AF ELT
Exterior
Exterior
Very Tidy Paint with Striking Decal Scheme
Interior
Year Interior
2026
Configuration
Passenger
Interior
Being Freshly Refurbished 2026 with New Leather and Flooring
Inspection Status
Inspection Status
Final Stages of Refurbishment
Can be Ready in Weeks
Fresh Engine / Prop
Will have Fresh ARA
Export CofA Can be Arranged

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

