Seller Information
View Seller InformationGeneral
Year
2011
Manufacturer
Model
Serial Number
60-0408
Registration #
N95CE
Condition
Used
Based at
IAH
Description
This exceptionally well-maintained, one U.S. corporate owner since new Learjet 60XR is enrolled on Bombardier’s Evolved Maintenance Program (EMP) and powered by engines on ESP Gold. With fewer than 3,000 total hours, coupled WAAS/LPV capability, and WiFi, it stands among the very best 60XR’s available anywhere in the world.
Airframe
Total Time
2,871
Total Landings
1,998
Airframe
2871 hours / 1998 landings
Engine Program
Engine 1 Maintenance Program
ESP Gold
Engine 1
Engine 1 Time
2,871 SNEW
Engine 2
Engine 2 Time
2,871
Avionics
Avionics/Radios
Rockwell Collins ProLine 21 Avionics System
Dual Air Data Computers
Dual Attitude Heading Reference Computers
ADF
Dual VHF Radios
CVR
Dual DME
EGPWS
WAAS/LPV
Dual Flight Guidance Controllers
Dual Flight Management Computers
Dual GPS Receivers
HF Radio
Stormscope
Radio Altimeter
TCAS II
Dual Transponders
Runway Awareness and Advisory System (RAAS)
Additional Equipment
Wifi
Yes
Additional Equipment
WIFI
LoPresti Boom Beam Recognition Lights
APU
Max-Viz EVS 1500
77 cu ft O2 bottle
Third Emergency Battery
Cockpit and Cabin Power Outlets
Exterior
Exterior
Teal and Mediterranean Sea stripes on a Matterhorn White Base. Base is original, stripes applied in 2022 by West Star
Interior
Interior
This eight passenger configuration features a forward 2-place divan across from a single forward facing seat
followed by a 4-place club in the aft cabin. The aft lavatory is equipped with a belted seat. A custom Renaissance aisle carpet, Edelman Cashmere Calf leather, Nickel satin finish hardware, and a high gloss Carl Booth veneer
finishes this exquisite interior.

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

