£416,164
£416,164 + VAT = GBP £478,589 (VAT applies to buyers in South Africa)
Aircraft Location:Krugersdorp, Gauteng, South Africa
Seller Information
View Seller InformationGeneral
Year
1974
Manufacturer
Model
Condition
Used
Description
Owner flown and operated. Aircraft has a permanent wing spar negating the need to repeated inspections. Good solid aircraft hangered on the highveld with no corrosion.
Airframe
Total Time
6,372.7
Engine 1
Engine 1 Make/Model
HONEYWELL TPE331-5-251K
Engine 1 Time
4,697.4 SNEW
Engine 1 TBO
5400
Engine 1 Notes
Engine Hot Section1800hrs. 669.7 hrs remaining
Engine 2
Engine 2 Time
4,697.4 SNEW
Engine 2 TBO
5400
Engine 2 Notes
Engine Hot Section: 1800 hrs. 669.7hrs remaining
Props
Prop 1 Manufacturer
HARTZELL
Prop 1 Model
HC-B3TN-5FL
Prop Specs
Prop Time 1 & 2: 108.3 SOH. 2891hrs remaining and only due 2029
Avionics
Avionics/Radios
Nav #1 Collins
Nav #2 Collins
Com #1 Collins
Com #2 TRIG
ADF Collins
Audio Panel Garmin GMA 350C with Blutooth
Radar Bendix King RDR 2000
DME
GPS King KLN64B
Garmin Gtx 345 in and out transponder
Stormscope BFG
KMD 850 MFD
EGPWS ground proximity warning
Radar altimeter
Altitude Alerter ( audio and visual indication when approaching selected altitude)
Collins AP106 Autopilot coupled to Collins FD 112 HSI and KLN 94B GPS
Aircraft approved by CAA for GNSS approaches
Fuel totaliser
406 ELT
Additional Equipment
Additional Equipment
Keith Freon air conditioner
Permanent wing spar negating need for recurring inspections
7 place passenger intercom system
Exterior
Exterior
Paint 7/10 White grey green
Deice boots good condition
Windows in good condition
Interior
Interior
Light cream leather Seats in good condition
Wood accent cabinets
Rear bench seat that can recline
Reading lights

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

