£3,909,648
Aircraft Location:Málaga, Andalusia, Spain
Seller Information
View Seller InformationGeneral
Year
2009
Manufacturer
Model
Serial Number
525B-0330
Registration #
CS-DOL
Condition
Used
FlightRules
IFR
Description
All maintenance completed including the 9000-hour heavy corrosion inspection and Doc 22.
No damage history
Ready to fly in EASA environment
Always hangared
Over $350,000 spent on maintenance in the last inspections
Airframe
Total Time
9,192
Total Landings
6,136
Range
3,600 Nm
Max Ramp Weight
6,328 kg
Max Takeoff Weight
6,291 kg
Max Landing Weight
5,783 kg
Max Zero Fuel Weight
4,468 kg
Engine Program
Engine 1 Maintenance Program
TAP Blue
Engine Specs
TAP Blue and Pro Parts
Engine 1
Engine 1 Make/Model
WILLIAMS FJ44-3A
Engine 1 Time
8,837 SNEW
Engine 2
Engine 2 Make/Model
WILLIAMS FJ44-3A
Engine 2 Time
8,837
Avionics
Flight Deck Manufacturer/Model
ROCKWELL COLLINS PRO LINE 21
ADS-B Equipped
Yes
WAAS
Yes
LPV
Yes
Avionics/Radios
Collins Proline 21
Collins FMS 3 0 0 0
Garmin 500W ADS-B/WAAS/LPV
Mark V Enhanced
EGPWS Tcas lI
Stormscope WX500
Cockpit Voice Recorder
Charts Interactive
Graphical Weather
Tail Flood Lights
Battery Charging System/3 110V Universal Plugs
Exterior
Exterior
Elegant white exterior paint with dual blue accent stripes and matching tail registration markings. Well-maintained aircraft featuring a clean, modern appearance and classic Citation styling.
Interior
Year Interior
2022
Number of Seats
7
Lavatory
Yes
Lavatory Configuration
Aft
Interior
Fwd 4 Place Club Seating w/2 Executive Tables, Aft 2 Place Club Seating Opposite Side-Facing Seat, Fwd Refreshment Center, Aft Belted Lavatory, Cabin Monitor, Collins Pro Line 21 Avionics and Cabin Temperature Control System. Refurbished in 2022.

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

