£59,434
Aircraft Location:Hawkesbury, Ontario, Canada
Seller Information
View Seller InformationGeneral
Year
1980
Manufacturer
Model
Serial Number
M2280
Registration #
C-GBSV
Condition
Used
Description
TT 9360 Hours, Engine 1258 SMOH, Lycoming 0-360, 180 HP Prop 427 SNEW, two-blade Sensenich, Garmin GFC-500 Autopilot, G5 AI, G5 HSI, GNX-375 GPS/Transponder w ADS-B in/out, GNC-255 Nav/Com radio, Aerobatic kit, Whelen LED Nav/Strobe lights, New Main landing gear tires, BatteryMinder 24V-4A CEC2 Charger, Replacement of fuel drain valve, cargo door lock, alternator switch 2024, Useful load 824 lb, Annual Nov-2025 (cyl comp: 76,74,74,76). Paint and Interior in 2000
Airframe
Total Time
9,360
Engine
Engine 1 Time
1,258 SMOH
Engine TBO
2000
Engine Specs
1258 Hours SMOH, Lycoming 0-360, 180 HP
Props
Prop Specs
427 SNEW, two-blade Sensenich 76EM8S5-0-60
Avionics
Avionics/Radios
Garmin
GFC-500 Autopilot
G5 AI
G5 HSI
GNX-375 GPS/Transponder w ADS-B in/out
GNC-255 Nav/Com radio
Bendix King
KX 155 Nav/Com radio
KMA 24 Audio Panel
VOR w glideslope ILS gauge
Dual USB Panel adapter
Artex ELT 406MHz
JPI
FS-450 Fuel Flow indicator
Electronics International
EGT, CHT & OAT Instrument
Flight Data Systems
GT-50 Flight Data meter
Additional Equipment
Additional Equipment
Aerobatic kit
Whelen LED Nav/Strobe lights
New Main landing gear tires
BatteryMinder 24V-4A CEC2 Charger
Replacement of fuel drain valve, cargo door lock, alternator switch 2024
New Sparkplugs, Replacement of Tanis heater elements, voltage regulator, turn coordinator 2025
Engine/Wing/Stab Winter Covers
Winter kit
Tow bar
Exterior
Year Painted
2000
Exterior
Painted in 2000
Interior
Year Interior
2000
Interior
Interior done in 2000

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

