Call for price
Aircraft Location:Addison, Texas, USA
Seller Information
View Seller InformationGeneral
Year
1992
Manufacturer
Model
Serial Number
26
Condition
Used
Registration #
N68TF
Description
• New Garmin Avionics Suite (2025)
• New Metallic Paint (2025)
• Fresh C+ Annual (03/2026)
• 2-Owner Aircraft
• 3500-Hour TBO Extension Complied
Airframe
Total Time
2,821.9
Engine 1
Engine 1 Make/Model
PRATT & WHITNEY PT6A-64
Engine 1 Time
2,821.9 SNEW
Engine 1 TBO
3500
Engine 1 Notes
Hours Since HSI: 1014.8 (P&W, 5/2006)
New CT Disk and Blades; Complied with all SBs for 3500-Hour TBO Extension
Props
Prop 1 Time
237.7 SOH
Number of Blades
4
Avionics
Avionics/Radios
• Dual RVSM Garmin G600TXi with Engine Monitoring System
• GI-275 Backup
• Dual GTN 750Xi
• GFC 600 Autopilot with Smart Glide and Emergency Descent
• GWX-8000 Radar
• GDL-60 Connext Datalink with LTE
• GCU-485 PFD Controller
• GMA-35 Audio Panel with 6-Position Bose Plug-Ins
• USB Power Supplies
• Starlink-Capable USB-C Power Supply
• Modified Overhead Panel to Match TBM 850
• Panel Glovebox
• Pulse Lights with AeroLED Landing Lights
Exterior
Year Painted
2025
Exterior
Metallic Paint with Final Clear Coat (Sunquest Air Specialties, November 2025)
Inspection Status
Inspection Status
• C+ Annual Inspection – Stellar Avion, March 2026
• Spinner, Prop and Exhaust Stacks Black Coated
• Replaced Torque Transducer
• Replaced Pressurization Controller
• 10-Year Electro-Hydraulic Generator Overhaul – October 2023
• Upgraded Nose and Main Landing Gear
Actuators to New 10-Year Actuators – October
2023
• 14-Year Fatigue & Corrosion Inspection (Upper
Fuselage, Horizontal Stabilizer, Left & Right Wing
Structures) – Columbia Aircraft, October 2023

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

