£236,529
Aircraft Location:Long Beach, California, USA
Seller Information
View Seller InformationGeneral
Year
2008
Manufacturer
Model
Serial Number
411052
Registration #
N450K
Condition
Used
FlightRules
IFR
Based at
KLGB
Airframe
Total Time
1,832
Max Takeoff Weight
1,632.93 kg
Basic Empty Weight
1,189.77 kg
Useful Load
442.71 kg
Fuel Capacity Volume
386.11 L
Complete Logs
Yes
Speedbrakes
Yes
Airframe
2/2019: LH door assembly replaced. LH door detached formt he aircraft in flight with no damage to the aircraft.
Engine
Engine 1 Make/Model
CONTINENTAL TSIO550C11
Engine Serial Number
802994
Engine 1 Time
686 STOH
Engine TBO
2000
Year Engine Overhauled or Installed as New
2008
Engine Time Remaining To Overhaul
167
Turbocharged
Yes
Engine Specs
Since Top Overhaul: 686 (All Six Cylinders replaced 12/2013 @ 1145TT)
Since New: 1832
Props
Prop Manufacturer
HARTZELL
Prop Model
HC-H3YF-1RF
Prop Time
107 SMOH
Number of Blades
3
Avionics
Auto Pilot
Yes
ADS-B Equipped
Yes
WAAS
Yes
LPV
Yes
Active Traffic
Yes
Avionics/Radios
Garmin G1000
Garmin GIA 63 NAV/COM/GPS w/ Glideslope Attitude Heading Reference System
WAAS Certified GPS
XM Satellite Weather and Radio
Garmin GFC700 Autopilot
Digital Audio Panel with Audio Playback
Traffic Advisory System
TAWS-B Terrain Awareness System
Backup Airspeed, Altimeter and Attitude Indicator
Ready Pad Keypad Controller
Additional Equipment
Oxygen System
Yes
Air Conditioning
Yes
Additional Equipment
Speed-Brakes
Inflatable Door Seals
Built-in Oxygen
Rudder Hold
Therma-wing De-Ice
Exterior
Year Painted
2008
Interior
Year Interior
2008
Number of Seats
4
Configuration
Passenger
Inspection Status
Inspection Status
Annual due March 2027
Airworthy
Yes

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

