£332,840
Aircraft Location:Kennesaw, Georgia, USA
Seller Information
View Seller InformationGeneral
Year
2008
Manufacturer
Model
Serial Number
172S10713
Registration #
N823MC
Condition
Used
Description
Lone Mountain Aircraft is pleased to offer this Cessna 172S with G1000 WAAS Integrated Avionics Suite with GFC700 Autopilot for LPV approaches. Only 3725 Total Airframe Time with a Factory Remanufactured Lycoming IO-360-L2a with 1175 Hours. XM Weather and Audio, 4 place Intercom, LED light upgrades and more!
Great Financing Rates and Terms Available! Call 1-800-LONE-MTN today to learn more!
Airframe
Total Time
3,725
Airframe
3725 Total Time
All logs Complete
Meticulous Maintenance
Engine
Engine 1 Time
1,175 SFRM
Engine TBO
2400
Engine Specs
Lycoming IO-360-L2A
1175 Since Factory Remanufactured Engine
Props
Prop Specs
McCauley Prop 1A170E/JHA7660
Avionics
Avionics/Radios
Garmin G1000 Avionics
Garmin GFC700 Autopilot
Garmin GMA-1360 Digital Audio Panel
4 Place Intercom System w/ Aux Audio Input
Garmin GIA-64 WAAS GPS/Nav/Comm w/ Glideslope (#1)
Garmin GIA-64 WAAS GPS/Nav/Comm w/ Glideslope (#2)
Garmin GTX-33 Mode S Transponder
Garmin GDC74A Air Data Computer
Garmin GA35 Antenna
Remote ELT
XM Weather & Audio
Backup Airspeed Indicator
Backup Vacuum Powered Attitude Indicator
Backup Altimeter
Standby PFD Battery
Additional Equipment
Additional Equipment
XM Weather & Audio
GFC700 Autopilot
WAAS GPS Navigation
LED Wingtip Strobe Lights
LED TailBeacon
ALL SPECIFICATIONS SUBJECT TO VERIFICATION UPON INSPECTION.
SOME FEATURES MAY REQUIRE ADDITIONAL SUBSCRIPTIONS.
Exterior
Exterior
Overall White with Tan, Maroon, Striping
Interior
Interior
Tan Leather with Grey Carpeting

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

