All(9)
£943,852
Aircraft Location:Jacksonville, Florida, USA
Seller Information
View Seller InformationGeneral
Year
1994
Manufacturer
Model
Condition
Used
Registration #
N69TP
FlightRules
IFR
Description
One of the best maintained and lowest time MD520 Notars in the USA. Well maintained and flies regularly. Premium Paint Job. 2230TT airframe and engine. Time will change as aircraft flies 2-3 hours per week. One of the few MD520s that was only used as a private ship from day 1.
Airframe
Total Time
2,230
Auxiliary Fuel Tank
Yes
Complete Logs
Yes
Engine 1
Engine 1 Make/Model
ROLLS ROYCE 250C20R
Engine 1 Time
2,230 SNEW
Engine 1 TBO
3500
Engine 1 Notes
No major inspections due until 3500 TBO. New Fuel Pump, New Bleed valve. More than 1100 hours on all engine components and engine accessories. over 1100 hours on 1&2 Wheels. Over 2300 Hours on 3rd &4th Wheel. 1200 hours before next major inspection,
Avionics
ADS-B Equipped
Yes
Artificial Horizon
Yes
Radar Altimeter
Yes
Single Pilot Operation
Yes
ELT
Yes
Traffic Avoidance System
Yes
Wire Strike Protection System
Yes
Avionics/Radios
GTN 650H
GTX 354R
GNC 255B
ASPEN EFI 1000 PROH
ESI 500/NAV/SYNTHETIC VISION
Additional Equipment
Additional Equipment
Slim Panel STC, Fargo Aux Tank, Meeker Quick Door Release, Sliding Window doors, Wire Strike kit
Exterior
Year Painted
2018
Door Type
Hinged
Exterior Notes
New Paint 2018
Interior
Year Interior
2022
Configuration
Corporate
Number of Seats
4
Soundproofing
Yes
Bubble Windows
Yes
Impact Resistant Windscreen
Yes
Interior Notes
Rear seat cushions removed but available with sale
Inspection Status
Inspection Status
Recent annual May 2026. All ADs and SBs up to date
Airworthy
Yes

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

