£2,565,941
Aircraft Location:Pompano Beach, Florida, USA
Seller Information
View Seller InformationGeneral
Year
2019
Manufacturer
Model
Serial Number
1274
Condition
Used
Registration #
N910EE
FlightRules
IFR
Based at
South Florida
Description
Call now about this Daher TBM 910:
- Pilot door equipped
- Garmin G1000 NXi
- One-owner aircraft
Airframe
Total Time
850
Max Takeoff Weight
3,353.86 kg
Fuel Capacity Volume
1,105.34 L
Complete Logs
Yes
Winglets
Yes
Airframe
Original CofA issued March 7th, 2019
Engine 1
Engine 1 Make/Model
PRATT & WHITNEY PT6A-66D
Engine 1 Time
850 SNEW
Engine 1 TBO
3500
Props
Prop 1 Manufacturer
HARTZELL
Prop 1 Model
HC-E5N-3C
Prop 1 Time
850 SNEW
Number of Blades
5
Prop Specs
Propeller overhauled June 25th, 2025 at 697.7 hours
Avionics
Flight Deck Manufacturer/Model
GARMIN G1000 NXI
ADS-B Equipped
Yes
SVT
Yes
Avionics/Radios
Avionics & Systems:
- Garmin G1000NXi
- AOA + Electronic Stability Protection (ESP) + Under speed Protection (USP) + Stick Shaker
- GLD 69A Sirius XM
- GSR 56 datalink
- Garmin SVT
- GWX 70 weather radar
- Chartview display on GDU
- Transponder diversity
Additional Equipment
Pressurised
Yes
Flight Into Known Icing (FIKI)
Yes
Exterior
Year Painted
2019
Exterior
Standard factory paint
- Large cargo door
- Pilot door
- Front storage compartment
- Over-wing emergency exit
Interior
Year Interior
2019
Interior
Original factory interior (like new):
- Deluxe wood trim finish
- 6 leather heated seats
- Storage cabinet
- Retractable tray table
- USB ports
- 115V plug
Inspection Status
Inspection Status
Last inspection: A+ performed in June 2026 by Daher at 782.1 hours
Next inspection: C+ due by June 2027 or 982.1 hours
Airworthy
Yes

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

