Call for price
Aircraft Location:Guatemala City, Guatemala, Guatemala
Seller Information
View Seller InformationGeneral
Year
2018
Manufacturer
Model
Serial Number
208B-5492
Condition
Used
Registration #
N2069W
Description
Textron Aviation is pleased to present this 2018 Grand Caravan EX on behalf of the aircraft owner.
Airframe
Total Time
1,866
Total Landings
1,866
Engine Program
Engine 1 Maintenance Program
ESP Gold
Engine 1
Engine 1 Time
1,866 SNEW
Engine 1 TBO
4000
Engine 1 Cycles
1,866
Props
Prop 1 Time
1866 SNEW
Avionics
Flight Deck Manufacturer/Model
GARMIN G1000 NXI
Avionics/Radios
STANDARD EQUIPMENT:
– Garmin G1000 NXi Avionics
– Garmin GIA 63W Dual Integrated Avionics Unit Includes Nav/Com/GPS
– Dual Attitude and Heading Reference System
– GFC-700 Automatic Flight Control System
– Garmin GTX 335 Transponder with ADS-B Capability
– Garmin Flight Stream 510
– Crew Alerting System
– Standby Instrumentation
– Artex ME-406 ELT
– Engine Indicating System
– Maintenance Diagnostics
Additional Equipment
Additional Equipment
OPTIONS INSTALLED:
– TKS Ice Protection – Radar
– ADS-B Out and In Functionality w/Single GTX 345
Transponder
– Garmin TAWS-B
– Jeppesen Chartview
– Garmin GTS825 TAS
– Garmin GWX70 – 4 Color Digital Weather Radar
– Air-conditioning, Cabin
– Aircraft Payload Extender STOL System
– Cargo Pod w/ Exhaust Deflector
– 17 Port Oxygen System
– Synthetic Vision Technology
– McCauley Propeller with TKS
– FA2100 CVDR
– Oversized Tires 29”
– Aero Twin Rudder Gust Lock
– Latin American Bi-Lingual Placards
Exterior
Year Painted
2018
Exterior
Overall white with black base and orange stripes.
Interior
Year Interior
2018
Interior
Canyon Interior Scheme installed.
CABIN:
– Cabin seating for 14 place Commuter

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

