£471,879
Aircraft Location:Glendale, Arizona, USA
Seller Information
View Seller InformationGeneral
Year
2014
Manufacturer
Model
Serial Number
0914
Registration #
N611RA
Condition
Used
FlightRules
IFR
Based at
KGEU
Description
N611RA is a beautiful low time
SR22-G5 GTS Turbo Platinum
Edition with the hard-to-find
GTS Hot Weather Package.
This is a fast, clean-wing airplane with a useful load of 1,154 pounds. Hangared in the dry climate of Phoenix, this plane has been maintained by Authorized Cirrus Service Centers.
With Cirrus Perspective Avionics, Upgraded Platinum Exterior and Leather interior, Factory Air Conditioning, Enhanced Top
Stability, Synthetic Vision. Perspective Avionics, Upgraded Platinum Exterior and Leather interior, Factory Air Conditioning, Enhanced Stability, Synthetic Vision and much more.
Why pay for FIKI and the added cost and maintenance if you don't fly in icing conditions. FREE transition training (by Cirrus Embark) included for qualified purchaser. Only 1100 Hobbs and 830 Flight Hours total!
Airframe
Total Time
830
Useful Load
523.45 kg
Complete Logs
Yes
Engine
Engine 1 Make/Model
CONTINENTAL TSIO550K
Engine Horsepower
234.9 kW
Engine 1 Time
830 SNEW
Engine TBO
2200
Year Engine Overhauled or Installed as New
2014
Turbocharged
Yes
Avionics
Flight Deck Manufacturer/Model
GARMIN CIRRUS PERSPECTIVE
ADS-B Equipped
Yes
WAAS
Yes
LPV
Yes
SVT
Yes
Avionics/Radios
Perspective Avionics
Enhanced Top Stability
Synthetic Vision
Enhanced Stability
Synthetic Vision
Additional Equipment
Oxygen System
Yes
Air Conditioning
Yes
Exterior
Year Painted
2014
Exterior
Upgraded Platinum Exterior
Interior
Year Interior
2014
Interior
Leather interior
Inspection Status
Inspection Status
CAPS Chute repacked 2024
Airworthy
Yes

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

