£2,087,680
Aircraft Location:Memphis, Tennessee, USA
Seller Information
View Seller InformationGeneral
Year
2003
Manufacturer
Model
Serial Number
550-1063
Registration #
N335RJ
Condition
Used
Based at
Birmingham, AL
Description
TWO OWNERS SINCE NEW, ONE OWNER LAST 12 YEARS, ALWAYS BASED IN BIRMINGHAM, AL, ALWAYS HANGARED
Airframe
Total Time
4,969
Parts Maintenance Program
ProParts
Engine Program
Engine 1 Maintenance Program
ESP Silver Lite
Engine 1
Engine 1 Make/Model
PRATT & WHITNEY
Engine 1 Time
814 SOH
Engine 2
Engine 2 Time
814 SOH
Avionics
Flight Deck Manufacturer/Model
HONEYWELL
ADS-B Equipped
Yes
Avionics/Radios
Honeywell Primus 1000 3 Tube EFIS Flight Displays
Honeywell Primus 1000 Autopilot
Dual Honeywell KY-196B Comms
Dual Honeywell KN-53 Navs
Honeywell KR-87 ADF
Dual BK MST-70B ADS-B Out Transponders
Dual Honeywell DM-441B DME
Universal UNS-1ESP
Honeywell Primus 880 Color Radar
Honeywell RT-300 Radio Altimeter
Honeywell CAS 81A TCAS II
Honeywell Mark VII EGPWS
Fairchild A200S CVR
Additional Equipment
Additional Equipment
HF Provisions
Bravo Style Step Assembly
Safeflight N1 Computer
Extended Aft Baggage
Pulselite Lighting System
Freon R-134 Air Conditioning
64 Cu Ft Oxygen System
Sun Visors
Artex ELT
Interior
Year Interior
2018
Interior
Forward club arrangement with two forward facing aft seats, two-place divan behind the copilot, forward refreshment center and aft belted lav, giving a total of nine passenger seat belts.
Modifications/Conversions
Modifications/Conversions
Two-place divan replacing single seat behind the copilot.
Inspection Status
Inspection Status
Fresh Phase 1-5 by Stevens Smyrna in process...perfect time to complete a pre-purchase inspection.

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

