Call for price
Aircraft Location:Denver, Colorado, USA
Seller Information
View Seller InformationSkyQuest International, LLC
Contact:Sales Team
Phone:+1 336-933-7041
Winston-Salem, North Carolina, USA
General
Year
1985
Manufacturer
Model
Serial Number
BL-125
Condition
Used
Registration #
N125KS
Description
• Limited-production B200 cargo-door variant
• Large factory cargo door measures 52 × 52 in.
• Typical missions: air ambulance, cargo and passenger/cargo combi
• Twin PT6A-42 engines with MORE inspections reported
• Operated by Alpine Air Express
Airframe
Total Time
29,601
Total Landings
35,547
Engine 1
Engine 1 Serial Number
PCE-PJ0143
Engine 1 Time
5,986 SNEW
Engine 1 TBO
8000
Engine 1 Notes
P&WC PT6A-42
Engine 2
Engine 2 Serial Number
PCE-PJ0142
Engine 2 Time
5,986 SNEW
Engine 2 TBO
8000
Engine 2 Notes
P&WC PT6A-42
Props
Prop Specs
Hartzell HC-E4N-3G
TBO:4,000 Hrs.
SN#:851024/860286
TSO:500 Hrs./547.2 Hrs.
OH Hrs Left: 3,500 Hrs./ 3,452.8 Hrs.
OH Cal. Left: 72 Months/69 Months
Avionics
Avionics/Radios
Dual Collins Proline avionics, RVSM, TAWS B, TCAS II
King KFC-300 Autopilot
Inspection Status
Inspection Status
Landing gear remaining: each main 7,851 landings / 65 months. Nose 7,596 landings / 56 months.
November 5 work in progress in Denver, CO: left overhauled propeller installation, Phase D1, both 200-hour engine MORE inspections, 1,500- and 3,000-hour eddy-current checks, flap wear, and checks of the cockpit, cabin, control lock, windows, doors, hatches, fuselage frame and stabilizers. Completion and signoffs: TBD. Systems work included altimeter, transponder and static system, avionics D/C/H, oxygen, both starter-generators, fire extinguisher, and weight and balance.

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

