£294,725
Aircraft Location:Vandalia, Ohio, USA
Seller Information
View Seller InformationGeneral
Year
2006
Manufacturer
Model
Serial Number
1990
Registration #
N232SR
Condition
Used
FlightRules
IFR
Description
N232SR is a hangered 2006 Cirrus SR22 G2 GTS featuring a new interior and a Signature Engine overhaul. The engine will be flown to 25 hours for break-in, including an oil change and oil analysis. Avionics include Avidyne Entegra flight displays, dual Garmin GNS 430W navigators, a Garmin audio panel, Garmin GTX 327 transponder, and DFC90 autopilot. Factory air conditioning and a 990-pound useful load round out this well-equipped Cirrus. Airframe time is 1,947 hours, with 35 hours on the propeller. CAPS service was completed in January 2026, with a fresh annual completed in September 2026 and IFR certification due April 2028.
Airframe
Total Time
1,947.5
Useful Load
449.06 kg
Complete Logs
Yes
Engine
Engine 1 Time
5 SMOH
Engine TBO
2000
Props
Prop Time
39 SMOH
Number of Blades
3
Blade Composition
Composite
Avionics
ADS-B Equipped
Yes
WAAS
Yes
Terrain Warning System
Yes
Engine Monitor
Yes
Avionics/Radios
Avidyne Entegra Primary Color Flight Display (PFD) Avidyne EX 5000 Multifunction Display
Garmin Audio Panel/Intercom Garmin
Dual GNS 430waas Garmin
Garmin GTX 325 Transponder
DFC90 Autopilot
L-3 Skywatch Traffic L-3 WX-500 Stormscope
Flight Director
EMAX TAWS
XM Datalink Weather and Audio
CMAX Electronic Approach Charts
Additional Equipment
Inadvertent Ice Protection
Yes
Additional Equipment
CMAX Electronic Approach Charts
Reiff Engine Heater
TKS Anti-Ice
Interior
Year Interior
2026
Number of Seats
4
Configuration
Passenger
Interior
New Interior 2026
Inspection Status
Airworthy
Yes
Service Logs
Miscellaneous

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

