Skambinti dėl kainos
Aircraft Location:Manassas, Virginia, JAV
Pardavėjo informacija
View Seller InformationGeneral
Metai
1980
Gamintojas
Modelis
Serijos numeris
LJ-0923
Būklė
Naudota
Registration #
N385EM
FlightRules
IFR
Based at
KCTJ
Aprašas
BLACKHAWK CONVERSION, Phases 1-4 inspections 2/2024 - MAKE OFFER
Airframe
Total Time
9,467
Total Landings
9,601
Complete Logs
Taip
Landing Gear Overhaul
Taip
Landing Gear Cycles Since Overhaul
2,019
Engine 1
Engine 1 Make/Model
PRATT & WHITNEY PT6A-135A
Engine 1 Serial Number
PCE-PZ0188
Engine 1 Time
3,942 SNEW
Engine 1 TBO
4000
Hot Section Time 1
835
Engine 1 Notes
PT6A-135A installed by Blackhawk Modifications Inc. (since new engines)
Engine 2
Engine 2 Make/Model
PRATT & WHITNEY PT6A-135A
Engine 2 Serial Number
PCE-PZ0189
Engine 2 Time
3,942 SNEW
Hot Section Time 2
835
Engine 2 Notes
PT6A-135A installed by Blackhawk Modifications Inc. (since new engines)
Props
Prop 1 Time
1654 SMOH
Prop 2 Time
1361 SMOH
Number of Blades
4
Prop Specs
Hartzell 4 Blade Props
Left propeller: overhauled Sept 27, 2016 1654.9 SPOH Sn FY3206
Right propeller: overhauled Aug 30, 2018 1361SMOH Sn FY4749
Avionics
Avionics/Radios
Garmin G600NXI Pilot side
G600 Autopilot
GTN 750
GTN 650
Garmin Radar
Dual Garmin Transponders ADSB Out
Additional Equipment
Pressurized
Taip
Oxygen System
0.62 m3
Inadvertent Ice Protection
Taip
Additional Equipment
Cabin Air Conditioning , New AC unite
Dual Heated Windshields
22 CU Ft. Oxygen System
Dual Cabin Tables
Lavatory Dual Sliding Doors
Polarized Interior Windows
Engine Sync. (not in service)
Auto Feather
TAWS
Exterior
Year Painted
2026
Exterior
New paint underway
Interior
Year Interior
2018
Number of Seats
5
Configuration
Passenger
Galley
Taip
Galley Configuration
Forward
Lavatory
Taip
Lavatory Configuration
Aft
Interior
All new interior underway. Club seating arrangement in grey leather, with fold out card tables. Aft belted lav. Double lanyard entrance door cables.
Inspection Status
Inspection Status
Landing Gear: Overhauled 2019
• Phases 1-4 inspections March 2024
* Phases 1 & 2 Underwasy
• 9000 cycle fuselage inspection per 53-10-00, figure 601
• outflow and safety valve cleaning
• L & R pneumatic filter cleaning
• L & R Chip detector continuity checks
• L & R fuel filter replacement
• igniters inspection
• L & R engine mount isolators inspection, New Engine Mounts
• L & R flow control solenoid filters cleaning
• Instrument filter replacement
• Pressurization control filter replacement and housing cleaning
• 200 hour lubrication
• L & R starter/generator brush checks
• Boots in very good condition

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

