Skambinti dėl kainos
Aircraft Location:Camden, Delaware, JAV
Pardavėjo informacija
View Seller InformationGeneral
Metai
1989
Gamintojas
Modelis
Būklė
Naudota
FlightRules
IFR
Based at
KVNY
Aprašas
World wide operations certified and currently on a Part 135 certificate. This a beautiful GIV ready to operate with a new owner.
Airframe
Total Time
18,680
Total Landings
8,300
Range
4,220 Nm
Max Takeoff Weight
33,202.96 kg
Basic Empty Weight
16,102.53 kg
Engine Program
Engine 1 Maintenance Program
Rolls Royce CorporateCare
Engine 1
Engine 1 Make/Model
ROLLS ROYCE TAY MK610-8
Engine 1 Serial Number
16349
Engine 1 Time
17,790 SNEW
Engine 1 Cycles Since Overhaul
7,895
Engine 2
Engine 2 Make/Model
ROLLS ROYCE TAY MK610-8
Engine 2 Serial Number
16348
Engine 2 Time
18,110 SNEW
Auxiliary Power Unit
APU
Taip
APU Time
8,135
APU Maintenance Program
Other
APU Notes
Gulfstream Computerized Maintenance Program
Avionics
Flight Deck Manufacturer/Model
HONEYWELL FZ820
Transponder 1 Manufacturer
ROCKWELL COLLINS
Transponder 1 Model
TDR94D
Transponder 2 Manufacturer
ROCKWELL COLLINS
Transponder 2 Model
TDR94D
Autopilot Manufacturer
HONEYWELL
Autopilot Model
SPZ-8000
ADS-B Equipped
Taip
FANS
Taip
WAAS
Taip
LPV
Taip
Additional Equipment
Wifi
Taip
Exterior
Year Painted
2016
Exterior
White with Black Accent striping
Interior
Year Interior
2016
Number of Seats
15
Galley
Taip
Galley Configuration
Aft
Lavatory
Taip
Lavatory Configuration
Forward and Aft
Interior
Light Tan leather seats and Walnut woodwork. Forward Crew Lav.
Inspection Status
Inspection Status
5000-Landing Gear inspection c/w 08/01/11. Gear overhaul c/w 07/20/11., Comscan inspection c/w 11/14/89 during production., Fresh 5000-Hour upgrade c/w by Gulfstream, Savannah, GA.
Airworthy
Taip

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

