£96,424
£96,424 + GST = GBP £110,888 (GST applies to buyers in Naujoji Zelandija)
Aircraft Location:Auckland, North Island, Naujoji Zelandija
Pardavėjo informacija
View Seller InformationDennis Thompson International Limited
Ryšiai:Dennis Thompson
Phone:+64 9 298 6249
Papakura, Naujoji Zelandija
General
Metai
1948
Gamintojas
Modelis
Būklė
Naudota
Registration #
ZK-BEB
Aprašas
All USA and Canadian & NZ Logs and records since new. Aircraft will be sold with a fresh 100 Hour/Annual/ARA Inspection.
This aircraft presents in pristine condition
RESTORATION: Carried out in 1995 by Gary Allen, USA. Aircraft re-wired, new control cables, flap motor & starter overhauled. Structural re-build.
GST applicable if sold in New Zealand. Please ask about the export price.
Airframe
Total Time
4,818
Variklis
Engine 1 Make/Model
JACOBS
Engine 1 Time
440 SOH
Engine TBO
1400
Engine(s)
Engines: Jacobs R755. 275 HP.
TBO: 1,400 Hours
Serial No: TBA
Total Time Run: Not Known
Time Since Major O/H: 440 Hrs
Note: O/H carried out by Air Repair Inc. USA with all upgrades
Props
Prop Manufacturer
HAMILTON STANDARD
Prop Time
166 SOH
Number of Blades
2
Avionics
Avionics/Radios
PS Engineering PS-8000B Audio/ICS
Garmin SL-40 VHF COM
Narco MK-12D NAV-COM
Garmin GTX-335 Transponder WAAS
Garmin GPS400 GPS
Kannad AF ELT
S-TEC System-20 Autopilot
Additional Equipment
Additional Equipment
Wheel Fairings
Dual Controls
50 AMP Alternator
Heavy Duty Main Landing Gear
Strobe Lights
Monarch Fuel Caps
BAS Tail Pull Handles
One Piece Windshield
Aileron Hinge Kit
BAS Shoulder Harness
C & D Heater
Heavy Fuselage Kit
Air Wolfe Filter
Cleveland Wheels & Brakes
Exterior
Exterior
Overall White with Blue accent trim
Interior
Year Interior
2013
Interior
Grey leather, New 2013

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

