£243,928
Aircraft Location:Lexington, Kentucky, JAV
Pardavėjo informacija
View Seller InformationGeneral
Metai
2002
Gamintojas
Modelis
Serijos numeris
172S9051
Registration #
N106VK
Būklė
Naudota
Aprašas
Extremely rare opportunity to own a very low time 172S with only 1430 hours SNEW! Paired with the Garmin GPS 175, KMD550 MFD, and the KAP 140 it is ready for any flight school or personal flyers needs. No damage history and complete logs, located in Lexington, Kentucky, for sale for 324,900!
Located in Lexington, KY – KLEX
Complete and Consecutive Logs
No Damage History
Useful Load 860 lbs.
December 2025 Annual Inspection
Airframe
Total Time
1,430
Complete Logs
Taip
Variklis
Engine 1 Time
1,430 SNEW
Engine TBO
2000
Engine(s)
1430 Hours SNEW
Lycoming IO-360-L2A
Props
Prop Specs
1067 Hours SPOH
McCauley 2-Blade Prop
Avionics
Avionics/Radios
Garmin GPS175 WAAS Navigator
Dual Bendix-King KX155 NAV/COMs
Bendix-King KMD550 MFD
Bendix-King KAP140 Autopilot with ALT Preselect
Bendix-King KMA28 Audio Panel
Appareo Stratus ESGi ADS-B In & Out Transponder
Davtron Digital Clock/Timer/Volts/OAT
Additional Equipment
Additional Equipment
Electric Pitch Trim
Flight Hour Recorder
True Airspeed Indicator
External Power Receptacle
Heated Pitot
Center Floor Console
Oil Quick Drain
53-Gallon Fuel System
Pilot/Copilot Articulating Seats
Dual Toe Brakes
Dual Push-to-Talk Switches
Seat Recliners/4 Headrests
Overhead Reading Lamps/Air Outlets
Internally Lighted Instruments
Control Wheel Map Light
Wingtip Strobes
Flashing Beacon
Under Wing Courtesy Lights
Refueling Steps and Handles Wing Strut/Wheel Fairings
RH Hinged Window
Exterior
Exterior
8 out of 10
Interior
Interior
8 out of 10

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

