£119,528
Aircraft Location:Aurora, Colorado, JAV
Pardavėjo informacija
View Seller InformationGeneral
Metai
1973
Gamintojas
Modelis
Serijos numeris
28-7310108
Registration #
N55031
Būklė
Naudota
FlightRules
IFR
Based at
KCFO
Aprašas
Bring the family along at approximately 150 MPH with a 1,324 lb useful load and a freshly overhauled O-540-B4B5 engine with only 15 hours SMOH. The aircraft features a Garmin GNX 375 with ADS-B, audible traffic and obstacle alerts, working wing leveler and heading hold, complete logs, and an exterior that still presents extremely well.
Conveniently located at Colorado Air and Space Port near Denver, approximately 15 minutes from Denver International Airport. The aircraft has been hangared in Colorado since at least 1980.
Airframe
Total Time
2,826
Max Takeoff Weight
1,360.78 kg
Basic Empty Weight
760.22 kg
Useful Load
600.56 kg
Fuel Capacity Volume
317.97 L
Complete Logs
Taip
Airframe
Exterior Paint 8/10
Variklis
Engine 1 Make/Model
LYCOMING O-540-B4B5
Engine Serial Number
L-6439-48
Engine 1 Time
15 SOH
Engine TBO
1800
Year Engine Overhauled or Installed as New
2025
Engine Time Remaining To Overhaul
1785
Engine(s)
Fresh Overhaul in November 2025.
Props
Prop Manufacturer
HARTZELL
Prop Model
HC-C2YK-18F
Prop Time
890 SNEW
Number of Blades
2
Avionics
Auto Pilot
Taip
ADS-B Equipped
Taip
Active Traffic
Taip
Terrain Warning System
Taip
Avionics/Radios
Garmin GNX 375 with ADS-B, installed in 2020
Audible obstacle and traffic warnings
Wing leveler
Heading hold
Exterior
Exterior
The exterior remains in excellent condition.
Inspection Status
Inspection Status
The aircraft experienced an off-airport landing in 1980. Following the incident, the engine, propeller, nose gear fairing, and nose gear strut were replaced.

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

