£1,627,888
Aircraft Location:Pompano Beach, Florida, JAV
Pardavėjo informacija
View Seller InformationGeneral
Metai
1994
Gamintojas
Modelis
Serijos numeris
0260
Registration #
N863JB
Būklė
Naudota
Aprašas
Low Time - New modern interior 2023 - Partial paint + stripes 2023 - L3 AVANCE WiFi - TBO Extension STC + HOTs C/W 2023 - Dual IFD 540's WAAS/LPV - DU-875 Tube Displays - Actively flown under Part 135 for the past ~3 years - Seller's replacement aircraft already in service
Airframe
Total Time
7,643
Total Landings
7,349
Engine Program
Engine 1 Maintenance Program
Other
Engine(s)
TBO Extension STC
Engine 1
Engine 1 Make/Model
PRATT & WHITNEY JT15D-5D
Engine 1 Time
7,357 SNEW
Engine 1 Cycles Since Overhaul
7,093
Engine 2
Engine 2 Make/Model
PRATT & WHITNEY JT15D-5D
Engine 2 Time
7,304 SNEW
Engine 2 Cycles Since Overhaul
7,045
Avionics
Flight Deck Manufacturer/Model
HONEYWELL PRIMUS 1000
ADS-B Equipped
Taip
WAAS
Taip
LPV
Taip
Avionics/Radios
Three (3) Tube EFIS
DU-875 Tubes
Dual IFD 540's
Dual BXT 6553 Transponders
Dual Becker AMU 6500 Audio Panels
AIS 380 Fuel Flow Indicator
Bendix King TPU 67B TCAS II
Fairchild A100 CVR
406 MHz ELT
Additional Equipment
Wifi
Taip
Additional Equipment
L3 AVANCE WiFi
Exterior
Year Painted
2023
Exterior
Partial Paint Refurb 2023
Overall white with royal blue and
light blue stripes - New 2023
Overall paint touch-up 202
Interior
Year Interior
2023
Number of Seats
9
Lavatory
Taip
Lavatory Configuration
Aft
Interior
Full Interior Refurb 2023
Nine (9) Place Interior
Forward Galley + Refreshment Area
Forward "Excel Style" two-place divan
Mid-cabin four-place executive club
Aft two forward-facing executive seats
Aft belted lavatory + closet / hanging space

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

