Visi(4)
£52,258
Aircraft Location:Victoria, British Columbia, Kanada
Pardavėjo informacija
View Seller InformationGeneral
Metai
1964
Gamintojas
Modelis
Būklė
Naudota
Aprašas
Very clean. Full IFR. Well maintained and regularly flown. Hull a 8.5, Inter a 7.5 original. 3560 TT, engine has 840 hrs since rebuild. Fresh annual. Full specs and multiple pics on request. Can deliver.
Airframe
Total Time
3,560
Range
700 Nm
Max Takeoff Weight
1,168 kg
Basic Empty Weight
709.87 kg
Useful Load
458.13 kg
Fuel Capacity Volume
196.84 L
Complete Logs
Taip
Airframe
Very good condition. Repainted. cowl speed mod. 1 pc windshield. LED landing light. Strobes. ADSB out.
Variklis
Engine 1 Make/Model
LYCOMING IO-360
Arklio jėgos
134.23 kW
Engine 1 Time
850 SMOH
Engine TBO
2000
Year Engine Overhauled or Installed as New
2006
Engine Time Remaining To Overhaul
1150
Engine(s)
recent mags and controlled by Slick Start module
Props
Prop Manufacturer
HARTZELL
Prop Time
7 SMOH
Number of Blades
2
Blade Composition
Aluminum
Prop Specs
New prop 500 hours ago. Shop rebuilt 7 hours ago. No restricted cruise rpm model.
Modifications/Conversions
Modifications/Conversions
Reduced cowl intake for better performance. One piece windshield.
Avionics
GPS 1 Manufacturer
GARMIN
GPS 1 Model
GNS430W
Transponder 1 Manufacturer
NARCO AVIONICS
ADS-B Equipped
Taip
WAAS
Taip
Terrain Warning System
Taip
Avionics/Radios
All the regular plus full IFR. Narco AT 150 TSO transponder; Garmin NAV VLOC ILS; Narco VOR/glide; Garmin 430W (WAAS); Narco Com 120 TSO (second radio); 4 place intercom; NAV/COM control unit.
Exterior
Exterior
8.5 out of 10.
Interior
Number of Seats
4
Configuration
Passenger
Interior
All original. 7.5 out of 10.

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

