Visi(13)
£133,722
Aircraft Location:Columbus, Ohio, JAV
Pardavėjo informacija
View Seller InformationGeneral
Metai
1974
Gamintojas
Modelis
Serijos numeris
28-7405079
Registration #
N734X
Būklė
Naudota
Based at
York, Pennsylvania, Airport ID: KTHV
Aprašas
2007 Total Time, 35 Hours on the Engine Overhaul, Avidyne 550 & 440, True Track Autopilot, Aspen PFD, Recent Leather Interior, Nice Paint, Hangared.
Airframe
Total Time
2,007
Complete Logs
Taip
Variklis
Engine 1 Make/Model
LYCOMING O-360-A4M
Engine 1 Time
35 SMOH
Engine TBO
2000
Engine(s)
Engine Overhauled by KTM Engines
Props
Prop Manufacturer
SENSENICH
Prop Time
2007 SOH
Number of Blades
2
Blade Composition
Aluminum
Prop Specs
Sensenich Prop was recently Dressed and Balanced.
Avionics
Avionics/Radios
Avidyne IFD-550 GPS/Comm
Avidyne IFD-440 GPS/Comm
Avidyne Audio Panel
Aspen Evolution PFD
True Track Autopilot with Altitude Hold
Synthetic Vision
4 Place Built-In Intercom
Additional Equipment
Additional Equipment
AV-30 Horizon
CGR-30P Engine Monitor
Electric Trim
4 Place Intercom
Dual Push to Talk Control Wheels
Avionics Master
Dual Pilot and Copilot Brakes
3d Horizon on Pilot Side
Vertical Card Compass
True Airspeed Indicator
Wheel Pants
2x USB Ports
Vent Fan - 3 Speed
Ground Service Plug
Bruce Custom Cover
Pilot Articulating, Vertical Adjusting Seat
48 Gallons Fuel
Hangared
Complete Logs
Exterior
Exterior
Allover White with Red Trim
Interior
Interior
Recent New Dark Tan Leather Seats
Tan Carpeting
New Side Panels
Beautiful Interior
Inspection Status
Inspection Status
Annual Due: September 2027
Hangared
Complete Logs Since New
Owned by a Retired Airline Pilot
** Specifications Subject to Verification Upon Inspection **
.

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

