Alle(74)
£984,801
Vliegtuig locatie:Columbus, Ohio, VS
Verkopersinformatie
Bekijk informatie van de verkoperLANE AVIATION
Contactpersoon:BRAD WILLETTE
Telefoon:(614) 681-7931
Columbus, Ohio, VS
Algemeen
Jaar
2017
Fabrikant
Model
Serienummer
TH2485
Registratie #
N67WM
Conditie
Gebruikt
Gebaseerd op
KJQF - Concord, N.C.
Omschrijving
591 Total Time Since NEW, G-1000NXi, GFC-700 Autopilot, Color Radar, Traffic & Weather, Known Icing, Factory Air, 190-Gallons Fuel. Private Owner in Charlotte, NC. Hangared at Concord. KJQF.
Luchtframe
Totale tijd
591
Casco
591 Total Time Since New
Engine 1
Engine 1 Make/Model
CONTINENTAL IO550C
Motor 1 PK
223.71 kW
Engine 1 Time
591 SNEW
Motor 1 TBO
1700
Engine 2
Engine 2 Make/Model
CONTINENTAL IO550C
Motor 2 PK
223.71 kW
Engine 2 Time
591
Rekwisieten
Prop-specificaties
McCauley 3 Blade
Avionica
Avionics/radio's
Garmin G-1000NXi Package
Garmin GTX-345R ADSB Transponder
Garmin GFC-700 Autopilot
GWX-68 Color Radar
GTS-800 TCAS
ADSB Traffic and Weather
Flight Stream
Extra materiaal
Extra uitrusting
Known Icing Certified
Factory Air
190 Gallons Fuel
LH Fold-Out Table
Club Seating
Cleveland Wheels and Brakes
Two New Batteries Installed in April 2026
.
Exterieur
Buitenkant
Allover White with Medium Metallic Blue and Metallic Black Trim
Interieur
Interieur
Slate Blue-Gray Leather Interior - 6 seats
Inspectiestatus
Inspectiestatus
Annual Due: November 2026
Note: Hard Landing Repair by Biggs in Oklahoma in 2018 at 32 Hours Total Time.
Wacked Left Prop in 8/19. Insurance Covered Tear Down Inspection and Prop Overhaul.
Complete Logs.
Privately Owned and Hangared in Concord, North Carolina. Airport ID: KJQF
* Specifications Subject to Verification Upon Inspection *
.

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

