£67,912
Vliegtuig locatie:London, Ontario, Canada
Verkopersinformatie
Bekijk informatie van de verkoperAlgemeen
Jaar
1962
Fabrikant
Model
Serienummer
24-2881
Registratie #
C-FQPA
Conditie
Gebruikt
Omschrijving
Freshly Overhauled, Zero-Timed Prop! Piper Commanche PA-24-180 - Vintage 1980’s paint scheme w/ Embossed Commanche Logo in Saddle Brown and Beige interior, Garmin GMA 350 Audio Panel (4-Place Stereo) Garmin GNC 355 WAAS GPS/COM Garmin GDL-82 ADS-B Datalink, Garmin GDL 52R ADS-B In (weather/traffic/terrain) Garmin Aera 660 (panel mounted)
Luchtframe
Totale tijd
5,171
Volledige logboeken
Ja
Casco
Complete 1000-hr gear overhaul 11/25 (Tri-City Aero, transmission repack/inspect)
Motor
Engine 1 Make/Model
LYCOMING O-360-A1A
Engine 1 Time
751 SFOH
Motor 1 TBO
2000
Rekwisieten
Prop fabrikant
HARTZELL
Prop-model
HC-C2YR-1BF
Proprevisietijd
0 SMOH
Aantal voorbladen
2
Mes Samenstelling
Aluminium
Prop-specificaties
Fresh Propeller Overhaul, Zero-Timed Propeller!
Avionica
WAAS
Ja
Avionics/radio's
Garmin GMA-350 Audio Panel (4-Place Stereo)
Garmin GNC-355 WAAS GPS/COM
Garmin GDL-82 ADS-B Datalink
Garmin GDL-52R ADS-B In (weather/traffic/terrain)
Garmin Aera 660 (panel mounted)
Garmin GI-106A CDI
Narco Mk 12D NAV/Com Radio
Narco AT 150 Transponder
Narco DME 190
Narco 111 VOR
Century IIB Autopilot Coupled to DG/AI/NAV/GNC-355
Extra materiaal
Extra uitrusting
Screw-on Oil Filter
SureFly Electronic Impulse Mag (Left)
One-Piece Windshield
Exterieur
Buitenkant
1980’s Vintage White Orange and Brown
Interieur
Configuratie
Passenger
Interieur
Embossed Commanche Logo in Saddle Brown and Beige
Inspectiestatus
Inspectiestatus
Annual due 11/26
THIS AIRCRAFT IS SUBJECT TO AVAILABILITY AND VERIFICATION OF SPECIFICATIONS

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

