£943,183
Vliegtuig locatie:Jacksonville, Florida, VS
Verkopersinformatie
Bekijk informatie van de verkoperAlgemeen
Jaar
1993
Fabrikant
Model
Conditie
Gebruikt
Registratie #
N69TP
Vluchtregels
IFR
Omschrijving
One of the best maintained and lowest time MD520 Notars in the USA. Well maintained and flies regularly. Premium Paint Job. 2230TT airframe and engine. Time will change as aircraft flies 2-3 hours per week. One of the few MD520s that was only used as a private ship from day 1.
Luchtframe
Totale tijd
2,230
Extra brandstoftank
Ja
Volledige logboeken
Ja
Engine 1
Engine 1 Make/Model
ROLLS ROYCE 250C20R
Engine 1 Time
2,230 SNEW
Motor 1 TBO
3500
Motor 1 Opmerkingen
No major inspections due until 3500 TBO. New Fuel Pump, New Bleed valve. More than 1100 hours on all engine components and engine accessories. over 1100 hours on 1&2 Wheels. Over 2300 Hours on 3rd &4th Wheel. 1200 hours before next major inspection,
Avionica
ADS-B uitgerust
Ja
Kunstmatige horizon
Ja
Radar hoogtemeter
Ja
singler Pilot bediening
Ja
ELT
Ja
Traffic Avoidance systeem
Ja
Kortsluiting Beveiligingssysteem
Ja
Avionics/radio's
GTN 650H
GTX 354R
GNC 255B
ASPEN EFI 1000 PROH
ESI 500/NAV/SYNTHETIC VISION
Extra materiaal
Extra uitrusting
Slim Panel STC, Fargo Aux Tank, Meeker Quick Door Release, Sliding Window doors, Wire Strike kit
Exterieur
Jaar geschilderd
2018
deur type
hangend
Buitenkant
New Paint 2018
Interieur
Jaar interieur
2022
Configuratie
corporate
Aantal zitplaatsen
4
geluidsdemping
Ja
bubbel ramen
Ja
Slagvast windscherm
Ja
Interieur
Rear seat cushions removed but available with sale
Inspectiestatus
Inspectiestatus
Recent annual May 2026. All ADs and SBs up to date
Luchtwaardig
Ja

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

