Bellen voor prijs
Vliegtuig locatie:Cuernavaca, Morelos, Mexico
Verkopersinformatie
Bekijk informatie van de verkoperAlgemeen
Jaar
2002
Fabrikant
Model
Conditie
Gebruikt
Gebaseerd op
CUERNAVACA, MORELOS, MÉXICO
Omschrijving
2002 Beech Jet 400A, S/N RK-331, registration XA-ESR. Seven-passenger configuration with equipped galley and interior in excellent condition. Powered by two Pratt & Whitney JT15D-5 engines, S/N PCE-JA0439 and PCE-JA0438, each rated at 2,965 lbs thrust. Both engines have 719.3 hours remaining to next overhaul and 1,800 hours remaining to next HSI. Phase A/B/C inspections completed July 2023 and Phase D completed July 2011. Aircraft compliant with applicable ADs and SBs. Equipped with Collins avionics including ALT-55B radio altimeter, VIR-132 navigation, ADC-850D air data computer, TTR-920 TCAS, TDR-94D transponder, GPS-4000A and Honeywell Mark V EGPWS. Exterior finished in white with burgundy and yellow stripes and falcon graphic.
Luchtframe
Totale tijd
6,290
Totale landingen
5,299
Engine Program
Engine 1 Maintenance Program
Geen
Motor 1 Opmerkingen
No engine maintenance program specified in available records.
Engine 1
Engine 1 Make/Model
PRATT & WHITNEY JT15D-5
Motor 1 serienummer
PCE-JA0439
Engine 1 Time
6,290
Motor 1 Opmerkingen
No engine maintenance program specified in available records.
Motor cycli
5,299
Hot Section Time 1
0
Engine 2
Engine 2 Make/Model
PRATT & WHITNEY JT15D-5
Motor 2 serienummer
PCE-JA0438
Engine 2 Time
6,290
Engine 2 Cycles
5,299
Hot Section Time 2
1,432
Motor 2 Opmerkingen
719.3 hours remaining to next overhaul. 1,800 hours remaining to next HSI.
Avionica
Flight Deck Manufacturer/Model
ROCKWELL COLLINS PRO LINE 21
Interieur
Aantal zitplaatsen
7

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

