£475,000
Vliegtuig locatie:Enstone, England, Groot-Brittannië
Verkopersinformatie
Bekijk informatie van de verkoperGemstone Aviation
Contactpersoon:David Blakemore
Telefoon:+44 7862 827186
Gagingwell, England, Groot-Brittannië
Algemeen
Jaar
2008
Fabrikant
Model
Serienummer
42.316
Registratie #
N648KM
Conditie
Gebruikt
Vluchtregels
IFR
Omschrijving
Very nicely presented 2008 DA42 Platinum Edition. Sold with a fresh annual inspection carried out October 2026.
This aircraft has been upgraded with the Crosby STC modification and now sports 155hp Continental turbodiesel engines and Scimitar Propellers. This gives NG performance to a TDI.
Platinum version features all options including a luxury interior, sunshades, electrically operated rudder pedals and Oxygen.
Other features to the superb avionics package are
- ADF
- DME
- TAS traffic advisory
- WX500 Storm Scope
- USB ports
Contact for further details or viewings.
Airframe
Totale tijd
1,420
Extra brandstoftank
Yes
Volledige logboeken
Yes
Engine 1
Engine 1 Make/Model
CONTINENTAL CD155
Engine 1 Time
205 SNEW
Motor 1 TBO
2100
Motor 1 met turbocompressor
Yes
Engine 2
Engine 2 Make/Model
CONTINENTAL CD155
Engine 2 Time
205 SNEW
Motor 2 TBO
2100
Props
Prop 1 Fabrikant
MT
Prop 1-model
MTV-6-A-C-F
Prop 1 revisietijd
205
Prop 2 Fabrikant
MT
Prop 2-model
MTV-6-A-C-F
Prop 2 revisietijd
205
Avionics
Flight Deck Manufacturer/Model
GARMIN G1000
Fabrikant stuurautomaat
BENDIX/KING
Stuurautomaatmodel
KAP140
Actief verkeer
Yes
Terreinwaarschuwingssysteem
Yes
Additional Equipment
Zuurstof Systeem
Yes
Vlucht naar bekend glazuur (FIKI)
Yes
Onbedoelde bescherming tegen ijs
Yes
Exterior
Jaar geschilderd
2008
Interior
Jaar interieur
2008

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

