£1,132,511
Vliegtuig locatie:Bourges, Centre-Val De Loire, Frankrijk
Verkopersinformatie
Bekijk informatie van de verkoperAlgemeen
Jaar
2004
Fabrikant
Model
Conditie
Gebruikt
Registratie #
N700EJ
Omschrijving
C&L Aviation is pleased to offer for sale this upgraded TBM 700 C2. This pressurized turboprop aircraft, ideally suited for both private and business travel,
FEATURES
• A modernized cockpit equipped with a Garmin G600 TXi flight display
• Garmin GTN 750 navigation system with Flight Stream option
• Garmin GTX 335R transponder with ADS-B Out capability.
• Under CAMO
• Direct maintenance support from Daher
The current owner is offering the aircraft for sale as part of an upgrade to another aircraft.Pre-purchase inspections can be arranged by appointment through our agency.
Luchtframe
Totale tijd
2,950
Engine Program
Motor 1 Opmerkingen
Engine has an estimated 550 hours remaining before overhaul.
A Hot Section Inspection (HSI) was recorded in March 2025 at 2,781.7 hours.
Engine 1
Engine 1 Make/Model
PRATT & WHITNEY PT6A-64
Engine 1 Time
2,950 SNEW
Motor 1 TBO
3500
Motor 1 Opmerkingen
Engine has an estimated 550 hours remaining before overhaul.
A Hot Section Inspection (HSI) was recorded in March 2025 at 2,781.7 hours.
Rekwisieten
Prop 1 Fabrikant
HARTZELL
Prop 1 revisietijd
168 SOH
Prop-specificaties
Underwent a complete overhaul in May 2025 at 2,781.7 airframe hours.
Avionica
Flight Deck Manufacturer/Model
GARMIN G600 TXI
GPS 1 fabrikant
GARMIN
GPS 1-model
GTN 750
Transponder 1 fabrikant
GARMIN
Transponder 1 model
GTX335R
ADS-B uitgerust
Ja
Extra materiaal
onder druk
Ja
Inspectiestatus
Inspectiestatus
Next prop overhaul is due in May 2031 or at 6,781.7 airframe hours, whichever occurs first.

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

