£63,642
Localização do Avião:Abbeville, Mississippi, EUA
Informações do vendedor
View Seller InformationGeral
Ano
1966
Fabricante
Modelo
Número de Série
TE-32
Cadastro #
N137F
Condição
Usado
Com base em
Abbeville, MS
Estrutura da aeronave
Tempo total
4,439
Airframe
Beechcraft Kit 58-4005-15 Kit both spar webbs.
Engine 1
Engine 1 Make/Model
CONTINENTAL IO520C
Motor 1 Cavalo de Potência
212.52 kW
Engine 1 Time
1,791 SFRM
Motor 1 TBO
1700
Motor 1 Notas
Engine times are as of 11/1/2025 last annual engine log book entry.
Engine 2
Engine 2 Make/Model
CONTINENTAL IO520C
Motor 2 cavalos de potência
212.52 kW
Engine 2 Time
1,791
Motor 2 Notas
Engine times are as of 11/1/2025 last engine log book entry.
Suportes
Prop 1 Fabricante
MCCAULEY
Prop 1 Tempo de revisão
977
Prop 2 Fabricante
MCCAULEY
Prop 2 Tempo de revisão
351
Prop Specs
Propeller time are as of 11/1/2025 last propeller log book entry.
Propellers have alcohol de-icers.
Modifications/Conversions
Vortex Generators
Sim
Aviônica
Equipado com ADS-B
Sim
Aviônicos/Rádios
Garmin GNS480 GPS/Nav/Com
Garmin SL30 Nav/Com
Garmin MX20 MFD/ Traffic
Garmin GMA 340 Audio Panel
Stratus/Appareo Transponder ADS-B In/Out
Dual Glideslope Indicators
GPS Steering
Century III Autopilot Coupled
Equipamentos adicionais
Equipamento adicional
Davtron Clock
Dual Brakes
Single Yoke
Vortex Generators
Alcohol Propeller De-Ice
Exterior
Exterior Notes
Overall White wit Blue and Gold striping (Good Condition)
Interior
Número de assentos
6
Interior Notes
Tan Sheep Skin Covers (Good Condition)
Estado de inspeção
Status da Inspeção
November 2025
Takeoff Incident with minor damage in 1979 and Propeller strike in 1990 repaired.
Spar Kit P/N 58-4008-15 installed on both spar webbs 10/1/1991.
Aeronavegável
Sim

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

