£68,186
Localização do Avião:London, Ontario, Canadá
Informações do vendedor
View Seller InformationGeral
Ano
1962
Fabricante
Modelo
Número de Série
24-2881
Cadastro #
C-FQPA
Condição
Usado
Descrição
Freshly Overhauled, Zero-Timed Prop! Piper Commanche PA-24-180 - Vintage 1980’s paint scheme w/ Embossed Commanche Logo in Saddle Brown and Beige interior, Garmin GMA 350 Audio Panel (4-Place Stereo) Garmin GNC 355 WAAS GPS/COM Garmin GDL-82 ADS-B Datalink, Garmin GDL 52R ADS-B In (weather/traffic/terrain) Garmin Aera 660 (panel mounted)
Estrutura da aeronave
Tempo total
5,171
Registros Completos
Sim
Airframe
Complete 1000-hr gear overhaul 11/25 (Tri-City Aero, transmission repack/inspect)
Motor
Engine 1 Make/Model
LYCOMING O-360-A1A
Engine 1 Time
751 SFOH
Engine TBO
2000
Suportes
Prop Fabricante
HARTZELL
Modelo Prop
HC-C2YR-1BF
Tempo de revisão do suporte
0 SMOH
Número de Lâminas
2
Composição da lâmina
Alumínio
Prop Specs
Fresh Propeller Overhaul, Zero-Timed Propeller!
Aviônica
WAAS
Sim
Aviônicos/Rádios
Garmin GMA-350 Audio Panel (4-Place Stereo)
Garmin GNC-355 WAAS GPS/COM
Garmin GDL-82 ADS-B Datalink
Garmin GDL-52R ADS-B In (weather/traffic/terrain)
Garmin Aera 660 (panel mounted)
Garmin GI-106A CDI
Narco Mk 12D NAV/Com Radio
Narco AT 150 Transponder
Narco DME 190
Narco 111 VOR
Century IIB Autopilot Coupled to DG/AI/NAV/GNC-355
Equipamentos adicionais
Equipamento adicional
Screw-on Oil Filter
SureFly Electronic Impulse Mag (Left)
One-Piece Windshield
Exterior
Exterior
1980’s Vintage White Orange and Brown
Interior
Configuração
Passenger
Interior
Embossed Commanche Logo in Saddle Brown and Beige
Estado de inspeção
Status da Inspeção
Annual due 11/26
THIS AIRCRAFT IS SUBJECT TO AVAILABILITY AND VERIFICATION OF SPECIFICATIONS

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

