Especificações
Ano2001
FabricanteCIRRUS
ModeloSR20
Número de Série1163
Cadastro #N222HW
CondiçãoUsado
Flight RulesIFR
Com base emKFLL
Tempo total2,600
AirframeAlways hangared
Engine 1 Make/ModelCONTINENTAL IO360
Engine 1 Time600 SMOH
Engine TBO2000
Prop FabricanteHARTZELL
Modelo PropPHC-J3YF-1RF
Número de Lâminas3
Flight Deck Manufacturer/ModelGARMIN
Display de voo primário 1 FabricanteASPEN AVIONICS
GPS 1 FabricanteGARMIN
GPS 1 ModeloGNS430
GPS 2 FabricanteGARMIN
Modelo GPS 2GNS420W
Transponder 1 FabricanteGARMIN
Transponder 1 ModeloGTX345
Piloto Automático FabricanteS-TEC
Modelo piloto automáticoSYSTEM 30
Equipado com ADS-BSim
Engine MonitorSim
Aviônicos/RádiosAspen & JPI
Equipamento adicionalVacuum Pump
Número de assentos4
InteriorComfortable seating for pilot and three passengers —ideal for personal and business travel.
Status da InspeçãoNext Annual Due July 2027
Fresh Magneto Overhaul
CAPS Parachute:
Cirrus Airframe Parachute System —next due April 2030
Rocket Assembly:
Parachute deployment rocket —next due June 2030
Line Cutters:
Parachute line cutter devices —due date to be confirmed at inspection
Ano2001|
FabricanteCIRRUS|
ModeloSR20|
Número de Série1163|
Cadastro #N222HW|
CondiçãoUsado|
Flight RulesIFR|
Com base emKFLL|
Tempo total2,600|
AirframeAlways hangared|
Engine 1 Make/ModelCONTINENTAL IO360 |
Engine 1 Time600 SMOH |
Engine TBO2000|
Prop FabricanteHARTZELL|
Modelo PropPHC-J3YF-1RF|
Número de Lâminas3|
Flight Deck Manufacturer/ModelGARMIN|
Display de voo primário 1 FabricanteASPEN AVIONICS|
GPS 1 FabricanteGARMIN|
GPS 1 ModeloGNS430|
GPS 2 FabricanteGARMIN|
Modelo GPS 2GNS420W|
Transponder 1 FabricanteGARMIN|
Transponder 1 ModeloGTX345|
Piloto Automático FabricanteS-TEC|
Modelo piloto automáticoSYSTEM 30|
Equipado com ADS-BSim|
Engine MonitorSim|
Aviônicos/RádiosAspen & JPI|
Equipamento adicionalVacuum Pump|
Número de assentos4|
InteriorComfortable seating for pilot and three passengers —ideal for personal and business travel.|
Status da InspeçãoNext Annual Due July 2027
Fresh Magneto Overhaul
CAPS Parachute:
Cirrus Airframe Parachute System —next due April 2030
Rocket Assembly:
Parachute deployment rocket —next due June 2030
Line Cutters:
Parachute line cutter devices —due date to be confirmed at inspection|