Todos(39)
£96,684
Localização do avião:Lake In The Hills, Illinois, EUA
Informação do Vendedor
Ver informações do vendedorGeral
Ano
1976
Fabricante
Modelo
Número de Série
177RG0920
Cadastro #
N33212
Condição
Usado
Descrição
We have a nice Cessna 177RG with only 3537 total time, 445 Hours Since Major Overhaul By Penn Yan Aero and a Garmin 530W GPS/COM/NAV. Based in the Midwest and hangered, this aircraft has been well maintained and is ready for its next adventure.. Give Kent or Kade a call to learn more about this aircraft.
Fuselagem
Tempo total
3,537
Airframe
• 3537 Total Time
• Aircraft Serial 177RG0920
Motor
Engine 1 Make/Model
LYCOMING IO-360-A1B6D
Engine 1 Time
445 SMOH
Engine TBO
2000
Engine(s)
• Lycoming IO-360-A1b6D S/N L-15519-51A
• 428 Hours Since Major Overhaul By Penn Yan Aero (08/2008)
Acessórios
Prop Fabricante
MCCAULEY
Modelo Prop
B2D34C207
Tempo de revisão do suporte
428 SMOH
Número de Lâminas
2
Prop Specs
• McCauley B2D34C207-B S/N 882009
• 445 Hours Since Major Overhaul By Tiffin Aire, Inc. (07/2008)
Aviônica
Aviônicos/Rádios
• Garmin GMA 340 Audio Panel
• Garmin GNS 530W GPS/NAV/COMM
• Narco MK12D TSO NAV/COMM
• Garmin GTX 327 Transponder
• Navomatic 300A AutoPilot
• JPI EDM 730 Engine Monitor
• uAvionix Tail Beacon ADS-B Out
Exterior
Exterior
• White with Blue and Light Blue Accents
Interior
Interior
• Original Blue Cloth Seats with matching Blur Carpet
• In Excellent Shape!
Inspection Status
Status da Inspeção
• Midwest based and hangerd
• Missing Logbooks (1976-1988)
• Emergency Landing Main Gear Collapsed (1991)
• Gear Up Landing (1989)
• Annual Due (05/2027)
• ELT battery Due (09/2026)
• Transponder Due (08/2026)
Logs de Serviços

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

