£216,776
£216,776 + VAT = GBP £249,292 (VAT applies to buyers in África do Sul)
Localização do avião:Johannesburg, Gauteng, África do Sul
Informação do Vendedor
Ver informações do vendedorGeral
Ano
1989
Fabricante
Modelo
Condição
Usado
Descrição
The 1989 F33A Bonanza is a versatile single-engine aircraft powered by a Continental IO-520-B engine, known for its speed and capability as a four or six-seater. It features a conventional “straight” tail, a spacious cabin, and can achieve a maximum cruise speed of around 182 knots.
Highlights:
LOW TIME AIRCRAFT
NO DAMAGE HISTORY
ENGINE WITHIN THE 12 YEAR ENGINE RULE (2019)
NEW WINDOWS
Fuselagem
Tempo total
1,872
Motor
Engine 1 Make/Model
CONTINENTAL IO520BB
Potência
285 kW
Engine 1 Time
173 SMOH
Engine TBO
1700
Ano do motor revisado ou instalado como novo
2019
Engine(s)
Time Since New: 1,872 Hrs
Acessórios
Prop Fabricante
HARTZELL
Tempo de revisão do suporte
1872 SNEW
Número de Lâminas
3
Prop Specs
Last Overhaul: 2019/12/10
Midlife inspection done: 850 Hrs - next due 2029/06/13
MPI done: 2025/08/14 - next due 2026/08/13
Aviônica
Aviônicos/Rádios
• King KMA20 : Audio Panel
• GARMIN GPS 400: GPS
• Dual King KX155 : NAV/COMM
• JPI EDM 830 : Engine Monitor
• King KFC200 : Autopilot / Flight Director
• King KN63 : DME
• King KR87 : ADF
• BFG WX900 : Stormscope
• King KT76A : Transponder
• Intercom
• ARTEX : ELT
Equipamento Adicional
Equipamento adicional
• Wing Bolts Inspections done 2021/01/21
• CSU Done 2024/06/13
• New windows
Exterior
Exterior
• Overall white with grey and blue accents 6/10
Interior
Número de assentos
6
Configuração
Passenger
Interior
• No. of Passengers: 1+5
• Original blue leather interior with matching carpets 6/10

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

