Ligue para saber o preço
Localização do avião:Stockholm, Stockholm, Suécia
Informação do Vendedor
Ver informações do vendedorGeral
Ano
1969
Fabricante
Modelo
Número de Série
59572
Cadastro #
SE-FKS
Condição
Usado
Flight Rules
IFR
Descrição
Nice and clean airplane, well maintained in good technical status with high SB and AD status. Cessna Corrosion inspection completed. Garmin installation 21-03-02. New front window and new tires all wheel 2020. New Exhaust system 2014. Factory Corrosion proofing. Acknowledge for IFR. The aircraft has always been on Swedish register dated 1970-03-16 when imported to Sweden from Cessna Factory in USA.
Aircraft will be operated approximately 200 hours prior to delivery.
Fuselagem
Tempo total
6,690
Airframe
Nice and clean airplane, well maintained - Good technical status with high SB and AD status!
Cessna Corrosion inspection completed.
IFR APPROVED!
Motor
Engine 1 Make/Model
LYCOMING
Engine 1 Time
50 SOH
Engine TBO
2000
Ano do motor revisado ou instalado como novo
2010
Acessórios
Prop Fabricante
MCCAULEY
Tempo de revisão do suporte
10 STOH
Número de Lâminas
2
Prop Specs
Top Overhaul complied with 2022-06-15
Modifications/Conversions
Modificações/Conversões
HORTON STOL Kit
Heated Static System
Aviônica
Equipado com ADS-B
Sim
Aviônicos/Rádios
Autopilot Century I – Wing leveler.
Garmin GMA345 Audio panel with Markers.
Garmin GNC 255A COM/NAV.
Garmin GI 106B CDI with Glideslope.
Garmin GTX335 ADS-B Transponder Mode S.
Dual altimeters.
ELT 406.
Equipamento Adicional
Equipamento adicional
Wheel Fairings
4 place Intercom
Exterior
Exterior
Overall Green, Black and White
Interior
Interior
Seats completed in beige leather.
Grey carpet. Side walls matching to seats.
All plastic details in good condition.

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

