£276,636
Localização do avião:Birmingham, Alabama, EUA
Informação do Vendedor
Ver informações do vendedorGeral
Ano
2008
Fabricante
Modelo
Número de Série
2995
Cadastro #
N160PG
Condição
Usado
Flight Rules
IFR
Com base em
BHM
Descrição
Aircraft Annual Scheduled 2/2/2026! Perfect time to buy.
2008 Cirrus SR22 GTS G3 (N160PG) is a well-equipped and well-maintained example with low total time. The aircraft has complete logs since new, no known damage history, current IFR certification, and the next annual inspection is scheduled for February 2026 at Southern Sky Aviation. The aircraft can be viewed in Birmingham, AL at KBHM - Southern Sky Aviation.
Fuselagem
Tempo total
1,663
Registros Completos
Sim
Motor
Engine 1 Make/Model
CONTINENTAL IO550N
Engine 1 Time
1,663 SNEW
Engine TBO
2000
Acessórios
Prop Fabricante
HARTZELL
Modelo Prop
PHC-J3YF-1RF
Tempo de revisão do suporte
212.9 SOH
Número de Lâminas
3
Composição da lâmina
Composite
Aviônica
Flight Deck Manufacturer/Model
AVIDYNE ENTEGRA EX5000
GPS 1 Fabricante
GARMIN
GPS 1 Modelo
GNS430W
GPS 2 Fabricante
GARMIN
Modelo GPS 2
GNS430W
Transponder 1 Fabricante
GARMIN
Transponder 1 Modelo
GTX330
Piloto Automático Fabricante
AVIDYNE
Modelo piloto automático
DFC90
Equipado com ADS-B
Sim
WAAS
Sim
Equipamento Adicional
Sistema de Oxigênio
Sim
Proteção contra gelo inadvertida
Sim
Ar Condicionado
Sim
Exterior
ano pintado
2008
Exterior
Overall, Silver with Black and Dark Grey striping
Interior
Ano Interior
2008
Número de assentos
4
Interior
Overall Black.
Inspection Status
Status da Inspeção
Annual C/W: February 2025 - Scheduled for 2/2/26 at Southern Sky Aviation.
IFR Check C/W: February 2025
CAPS C/W: November 2017
No Known Damage History
All Logs Since New
Aeronavegável
Sim

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

