Ligue para saber o preço
Localização do avião:Scottsdale, Arizona, EUA
Informação do Vendedor
Ver informações do vendedorGeral
Fuselagem
Tempo total
10,212.1
Peso máximo da rampa
6,803.89 kilos
Peso máximo de decolagem
6,713.17 kilos
Peso Máximo de Aterrissagem
6,123.5 kilos
Peso Zero Máximo Combustível
5,125.59 kilos
Peso Vazio Básico
4,134.04 kilos
Programa de Manutenção de Peças
ProParts
Engine Program
Engine 1 Maintenance Program
PowerAdvantage+
Engine 1
Engine 1 Make/Model
PRATT & WHITNEY PW530A
Engine 1 Time
9,623 SNEW
Engine 1 Cycles Since Overhaul
4,610
Engine 2
Engine 2 Make/Model
PRATT & WHITNEY PW530A
Engine 2 Time
9,815.4
Engine 2 Cycles Since Overhaul
4,713
Aviônica
Aviônicos/Rádios
Honeywell Primus 1000 Three Tube Display
COMM - Dual Honeywell KY-196 B (8.33)
NAV - Dual Honeywell KN-53
Autopilot / FD - Honeywell Primus 1000
ADF - Dual Honeywell KR-87
DME - Dual Honeywell DN-441B
Radar Altimeter - Collins ALT-55B
Transponder - Dual Honeywell KT-74
Radar - Honeywell WU-660
FMS - GNS-XLS FMS
EGPWS - Honeywell Mark VII
CVR - Fairchild A2000S
HF - KHF 950
ELT - Artex C406-2
TCAS II - Honeywell TPU 67B
FDR - Fairchild F100
GPS - Garmin G625xi
Equipamento Adicional
Equipamento adicional
ADS-B Out
Garmin G625xi
8.33 KHz Spacing
FM Immunity
Enhanced Mod S
ADS-B Out
RVSM & B-RNAV Compliant (Commercial EASA approved)
Exterior
Exterior
Fresh Paint in 2025 - Overall Matterhorn White
Interior
Interior
Eight (8) passengers center club interior, two (2) AFT
forward -facing seats, with a front aft facing seat and belted
lav. Recent seat refurbishment.
Inspection Status
Status da Inspeção
Pre-Purchase Inspection cw. December 2025
Phase 3 cw. June 2025
Phase 5 cw. June 2025
Phase 18 cw. October 2025
Will be delivered on US REG

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

