£183,376
Localização do avião:Mlada Boleslav, República Tcheca
Informação do Vendedor
Ver informações do vendedorGeral
Ano
1984
Fabricante
Modelo
Número de Série
34-8433025
Cadastro #
OK-MMG
Condição
Usado
Com base em
LKMB
Descrição
Piper Seneca III PA34-220T under Czech AOC operation!!!
HIGHLIGHTS
• All AD's & STC's are done.
• OVH of Janitrol combustion heater is done on July 2025.
• Fuel capacity 128 USG (123 USG Usable). Certified for Flight Into Known Icing.
• Annual inspection done on October 2025. ARC valid from August 2025
Possibility to sell with EASA AOC!!!
Fuselagem
Tempo total
4,170
Registros Completos
Sim
Airframe
Always hangared
All SID and AD´s Done
No known damage history
All logs available
The aircraft can stay under our AOC.
Engine 1
Engine 1 Time
4,170 SNEW
Motor 1 TBO
2000
Ano do motor 1 revisado ou instalado como novo
2018
Motor 1 Notas
RH Engine 698 hrs to OVH (OVH was July 2018)
Engine 2
Engine 2 Time
4,170 SOH
Motor 2 TBO
2000
Ano do motor 2 revisado ou instalado como novo
2018
Motor 2 Notas
LH Engine 698 hrs to OVH (OVH was July 2018)
Acessórios
Prop Specs
Propellers 1310 hrs to OVH (OVH was March 2023)
Aviônica
Aviônicos/Rádios
Garmin 2xGarmin G5 Primary
NAV/COM/GPS Garmin TGN 650
NAV/COM/ Garmin GNC 255A
Engine Management Display System
New RPM display
Autopilot
DME Bendix/King
XPDR Garmin S
ELT Artex 345
Weather radar
Equipamento Adicional
Voo em gelo conhecido (FIKI)
Sim
Exterior
Exterior Notes
10/10
Interior
Número de assentos
6
Interior Notes
6 seats configuration in leather and rated 10/10
Inspection Status
Status da Inspeção
Annual inspection done on October 2025. ARC valid from August 2025
All AD's & STC's are done.
OVH of Janitrol combustion heater is done on July 2025.

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

