£49,040
Localização do avião:Prince Albert, Alberta, Canadá
Informação do Vendedor
Ver informações do vendedorGeral
Ano
1966
Fabricante
Modelo
Número de Série
3358
Cadastro #
C-GYUC
Condição
Usado
Flight Rules
VFR
Descrição
1966 Mooney M20C – C-GYUC | Excellent Condition | Fresh Prop
Clean and well-presented 1966 Mooney M20C, known for its excellent cross-country performance, efficiency, and classic Mooney speed. This aircraft shows extremely well with 8/10 exterior and interior, making it a standout example of the dependable M20C.
Airframe:
3,436.1 Hours Total Time
Engine:
Lycoming O-360-A1D
1,560.8 Hours Since Major Overhaul
Propeller:
Hartzell 2-Blade
2.9 Hours Since Overhaul (August 2024)
Avionics:
Apollo II Morrow GPS
Narco MK12D TSO NAV/COM
Narco AT50A TSO Transponder
Narco DME 890
ADF T-12C
TELEX TC-200 Audio Control
Additional Equipment:
Artex 345 406 MHz ELT
4-Place Intercom
Whelen LED flashing anti-collision light
This aircraft represents an excellent opportunity to own a well-kept Mooney with strong performance and efficient operating costs, ideal for personal travel and cross-country flying.
Fuselagem
Tempo total
3,436.1
Peso máximo de decolagem
1,168 kilos
Peso Vazio Básico
721.21 kilos
Carga Útil
446.79 kilos
Volume de capacidade de combustível
196.84 L
Motor
Engine 1 Make/Model
LYCOMING O-360-A1D
Potência
134.23 kW
Engine 1 Time
1,560.8 SMOH
Engine TBO
2000
Acessórios
Prop Fabricante
HARTZELL
Número de Lâminas
2
Prop Specs
Overhauled August 2024
Aviônica
Aviônicos/Rádios
Apollo II Morrow GPS
Narco MK12D TSO NAV/COM
Narco AT50A TSO Transponder
Narco DME 890
ADF T-12C
TELEX TC-200 Audio Control
Exterior
Exterior
8/10
Interior
Número de assentos
4
Configuração
Passenger
Inspection Status
Aeronavegável
Sim

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

