£48,761
Localização do avião:Brookfield, Connecticut, EUA
Informação do Vendedor
Ver informações do vendedorGeral
Ano
1967
Fabricante
Modelo
Número de Série
15066734
Condição
Usado
Flight Rules
VFR
Descrição
Cessna 150G, N2834S, meticulously upgraded and professionally maintained. with over $50,000 invested into airframe, avionics, and systems.The aircraft features a full exterior repaint ($25,000) completed to a high standard, along with $5,000 in flight control system improvements ensuring precise handling and reliability. A comprehensive annual inspection was completed with $13,000 invested, that reflects a no-expense-spared approach to maintenance. Avionics and ignition upgrades include a modern AV-30 installation ($8,000), new magnetos, and the addition of a push-start system for enhanced operational convenience. This is a clean, turnkey C150G with extensive upgrades—ideal for training, time building, or personal ownership. Serious inquiries only.
Fuselagem
Tempo total
3,293
Registros Completos
Sim
Airframe
$5,000 in flight control system improvements ensuring precise handling and reliability.
Motor
Engine 1 Make/Model
CONTINENTAL
Engine 1 Time
1,400 SMOH
Engine TBO
1800
Engine(s)
Millennium Cylinders
New Magnetos
New Push Button Starter
Acessórios
Prop Time Since
SOH
Número de Lâminas
2
Composição da lâmina
Alumínio
Prop Specs
205 SPOH
Aviônica
Aviônicos/Rádios
AV-30
Garmin GTX 327
Garmin GTR 225
Yoke Mounted Garmin Aero 660 VFR Navigator
Tail Beacon UV Avionics ADS-B Out.
Exterior
ano pintado
2025
Exterior
full exterior repaint ($25,000)
Interior
Número de assentos
2
Interior
Fresh Detail
Good Shape
Inspection Status
Status da Inspeção
Annual Due Sep 2026
Aeronavegável
Sim

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

