£1,160,908
Localização do avião:Columbus, Ohio, EUA
Informação do Vendedor
Ver informações do vendedorGeral
Ano
2008
Fabricante
Modelo
Número de Série
000145
Cadastro #
N145EA
Condição
Usado
Com base em
KCOS - Colorado Springs
Descrição
3360 Total Time, 41 / 41 Since Pratt Overhaul with 3500 TBO's, Recent Inspections and 300 Hour all done by Eclipse, Gorgeous Paint & Interior with New Carpeting, Avio 2.08 NG Avionics Pkg, Hangared, No Damage History and ready to fly anywhere!
Fuselagem
Tempo total
3,360
Total de desembarques
3,371
Engine Program
Engine 1 Maintenance Program
Não Possui
Engine 1
Engine 1 Make/Model
PRATT & WHITNEY PW610F
Engine 1 Time
41 SOH
Motor 1 TBO
3500
Motor 1 Notas
Engine Overhaul by Pratt & Whitney
Engine 2
Engine 2 Make/Model
PRATT & WHITNEY PW610F
Engine 2 Time
41 SOH
Motor 2 TBO
3500
Aviônica
Aviônicos/Rádios
Avio NG Avionics Package
Dual AHRS
XM Weather
Color Radar
BFG Skywatch Traffic System
Strikefinder
Electronic Charts with Keyboard
Equipamento Adicional
Equipamento adicional
RVSM
Taxi Recog Lights
Footwell Lighting
110 Volt Power Outlets
LX Edition Interior
Always Hangared
Complete Log books
All ADs and MSBs Complied With
Owner has it on a FAA Part 135 Certificate
Exterior
Exterior
Allover White with Red and Blue Trim.
Eclipse has always been hangared and Paint in Outstanding Condition.
Interior
Interior
LX Edition Interior in Medium Gray Leather. Nice
Newly Installed Carpeting.
Gorgeous Paint and Interior
Inspection Status
Status da Inspeção
300 Hour Inspection in October 2025
All AD's & MSB C/W.
Maintained to FAA Part 135 Standards.
Maintenance by Eclipse in New Mexico
** Specifications Subject to Verification Upon Inspection **
.

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

