£177,366
Localização do avião:Fayetteville, Arkansas, EUA
Informação do Vendedor
Ver informações do vendedorSouth Delta Aviation, Inc.
Contato:Darryl Riddell
Telefone:(479) 935-4891
Fayetteville, Arkansas, EUA
Geral
Ano
1988
Fabricante
Modelo
Número de Série
CE-1215
Cadastro #
N3106D
Condição
Usado
Descrição
1988 Beechcraft F33A Bonanza 3182 TTAF, 1241 SNEW. Equipped with:
- GNS 530W
- JPI EDM 830
- KFC 150 with Yaw Damp
- Shadin Fuel Flow
- Garmin GTX 330ES
- KX 155 NAV/COM
- D'Shannon Tip Tanks (15 Gallons Each)
- TKS De-Icing System
No Hail Damage
Always Hangared
Complete Logs Since New
Nose gear collapse on rollout in 1991. All repairs documented with no related issues since.
New paint touch-up May 2026
Fuselagem
Tempo total
3,182
Carga Útil
461.76 kilos
Tanque de Combustível Auxiliar
Sim
Registros Completos
Sim
Motor
Engine 1 Time
1,241 SNEW
Engine TBO
1700
Engine(s)
Engine: Continental IO-520-BB, S/N 830088-R, 1241 SNEW in 2004
Acessórios
Prop Specs
Prop: McCauley 3A32C406-C, S/N 930878, 798 SPOH By Sensenich Propeller in 2011
Aviônica
Aviônicos/Rádios
JPI 830, Garmin GNS 530W, Shadin Fuel Flow, KFC 150 Autopilot with Yaw Damp, Garmin GTX 330 ES Transponder, King KX 155 NAV/COMM, WX-10A Stormscope,
Equipamento Adicional
Equipamento adicional
TKS De-icing system, D’shannon Tip tanks, Rosen sunvisors, Marsh Brothers Brake Cylinders, Pilot Bose plug
Exterior
Exterior
Aircraft painted in 1999
Inspection Status
Status da Inspeção
Inspection Status/Maintenance:
Annual Inspection: Completed January 2026
Pitot Static, Altimeter, and Transponder checks: Completed October 2024
Useful Load: 1018 lb
Damage History: Nose gear collapse on rollout 1991
Complete Logs: Yes
Logs de Serviços

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

