1999 DASSAULT FALCON 2000
Descrição
This aircraft represents among the lowest time Falcon 2000’s in the market. It features the PRO LINE 21 Upgraded cockpit, full engine coverage, and excellent inspection status. In addition, it is a FANS compliant aircraft with CPDLC and WAAS/LPV. The maintenance history on this aircraft is exceptional with Westar doing the major inspection. Aircraft availability is early August when the owner takes delivery of his replacement aircraft. Especificações
Ano1999
FabricanteDASSAULT
ModeloFALCON 2000
Número de Série074
CondiçãoUsado
Tempo total6,562
Total de desembarques4,122
Engine 1 Maintenance ProgramCSP Gold
APUSim
Tempo APU3,413
Notas APUGTCP36-150(F2M) ,
Equipado com ADS-BSim
FÃSSim
WAASSim
LPVSim
CPDLCSim
Aviônicos/RádiosPro Line 21 Integrated Avionics Suite, with CPDLC, WAAS?LPV; FANS 1A
Wi-fiSim
Equipamento adicionalPro Line 21 with FANS 1+
ano pintado2023
Ano Interior2023
InteriorBeautifully appointed 10-passenger interior with neutral tones and high-gloss burled wood cabinetry
throughout. Features forward 4-place club seating, aft 3-place divan opposite 2 club chairs, forward galley with
sink, and multiple monitors.
Status da Inspeção1C Check Due November 2029
Landing Gear Due November 2035
Last Major Check C Check completed by Westar
Ano1999|
FabricanteDASSAULT|
ModeloFALCON 2000|
Número de Série074|
CondiçãoUsado|
Tempo total6,562|
Total de desembarques4,122|
Engine 1 Maintenance ProgramCSP Gold|
APUSim|
Tempo APU3,413|
Notas APUGTCP36-150(F2M) ,|
Equipado com ADS-BSim|
FÃSSim|
WAASSim|
LPVSim|
CPDLCSim|
Aviônicos/RádiosPro Line 21 Integrated Avionics Suite, with CPDLC, WAAS?LPV; FANS 1A|
Wi-fiSim|
Equipamento adicionalPro Line 21 with FANS 1+|
ano pintado2023|
Ano Interior2023|
InteriorBeautifully appointed 10-passenger interior with neutral tones and high-gloss burled wood cabinetry
throughout. Features forward 4-place club seating, aft 3-place divan opposite 2 club chairs, forward galley with
sink, and multiple monitors.|
Status da Inspeção1C Check Due November 2029
Landing Gear Due November 2035
Last Major Check C Check completed by Westar|