£150,258
Localização do avião:Burlington, Ontario, Canadá
Informação do Vendedor
Ver informações do vendedorAPEX AIRCRAFT SALES LTD
Contato:Madison Furgala
Telefone:+1 416-389-1917
Breslau, Ontario, Canadá
Geral
Ano
2001
Fabricante
Modelo
Número de Série
27-0304
Cadastro #
C-GYAM
Condição
Usado
Flight Rules
IFR
Com base em
CZBA
Descrição
Apex Aircraft is proud to this exceptional Mooney M20M. Perfect for pilots seeking performance and reliability in a well-equipped package.
Current annual inspection was completed December 2025. Fully IFR certified and equipped with a King KFC225 2-axis autopilot, this M20M is built for cross-country flying with comfort and confidence.
Whether you're looking to upgrade or step into high-performance flying, this Mooney M20M delivers the speed, safety, and capability that discerning pilots demand.
Fuselagem
Tempo total
2,484.9
Peso máximo de decolagem
1,527.7 kilos
Carga Útil
425.86 kilos
Airframe
Built In Oxygen
Motor
Engine 1 Make/Model
LYCOMING TIO-540-AF1B
Engine 1 Time
1,938.1 SFRM
Engine TBO
2000
Ano do motor revisado ou instalado como novo
2005
Turbocarregado
Sim
Acessórios
Prop Fabricante
MCCAULEY
Número de Lâminas
3
Aviônica
Aviônicos/Rádios
Equipped with:
- Garmin GTN750
-Garmin GTN 650
- Garmin GTX345
- Garmin Flight Stream 510 (2019) Cockpit Connectivity
- Garmin 35c Remote Audio Panel
- Garmin GI106A Glideslope Indicator
- King KCS55a HSI, King KI256 FD
- BFG Skywatch Collision Avoidance
- BFG WX 500 Stormscope
- EDM 700 Engine Monitor
- Oxygen System 115 CU/FT
Equipamento Adicional
Equipamento adicional
New Digital GPS Antennae done in 2024
New ELT in 2025
Interior
Interior
New leather done in 2019
Logs de Serviços

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

