Ligue para saber o preço
Localização do avião:Capua, Campania, Itália
Informação do Vendedor
Ver informações do vendedorGeral
Ano
2017
Fabricante
Modelo
Número de Série
217
Cadastro #
I-OZZC
Condição
Usado
Descrição
Twin-engine performance at single-engine running costs. This 2017 Tecnam P2006T MKII is fully IFR-equipped with the Garmin G950 glass panel, dual WAAS GPS with LPV approaches and S-TEC System 55X dual-axis autopilot. Power comes from two Rotax 912S3 engines with MT constant-speed propellers, upgraded to 70 Amp alternators, and the right-hand engine has only 442 hours since new. A proven platform for MEP training and a genuinely economical cross-country traveller, impeccably maintained throughout. Offered through Altair's Tecnam Certified Pre-Owned program with factory-backed history verification.
Fuselagem
Tempo total
3,229
Engine 1
Engine 1 Make/Model
ROTAX 912S3
Motor 1 Cavalo de Potência
74.57 kW
Engine 1 Time
1,229 SNEW
Motor 1 TBO
2000
Motor 1 tempo restante para revisão
771
Engine 2
Engine 2 Make/Model
ROTAX 912S3
Motor 2 cavalos de potência
74.57 kW
Engine 2 Time
442
Tempo restante do motor 2 para revisão
1558
Acessórios
Prop 1 Fabricante
MT
Prop 1 Tempo de revisão
1464 SNEW
Prop 2 Fabricante
MT
Prop 2 Tempo de revisão
1464 SNEW
Composição da lâmina
Composite
Aviônica
Flight Deck Manufacturer/Model
GARMIN G950
Display de voo primário 1 Fabricante
GARMIN
Exibição Primária de Voo 1 Modelo
GDU1050
GPS 1 Fabricante
GARMIN
GPS 1 Modelo
GIA63W
Transponder 1 Fabricante
GARMIN
Transponder 1 Modelo
GTX345R
Equipado com ADS-B
Sim
WAAS
Sim
LPV
Sim
Sistema de alerta de terreno
Sim
Engine Monitor
Sim
Exterior
ano pintado
2017
Interior
Ano Interior
2017

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

