Fiyat için arayın
Aircraft Location:Monte Carlo, Monako
Satıcı Bilgileri
View Seller InformationGeneral
Yıl
2001
Üretici
BOEING
Model
BBJ
Seri Numarası
29200
Registration #
VP-BVV
Koşul
Kullanılmış
Based at
Europe
Açıklama
Immaculate condition BBJ with 8 aux fuel tanks.
Entry into service in 2001
4,578 hours / 1,854 cycles
144-mo inspection, Landing gear overhaul completed in 2025
Interior refurbished in 2025
Repaint in 2019
KA Band WI-FI
Airframe
Total Time
4,584
Winglets
Evet
Engine Program
Engine 1 Maintenance Program
None
Engine(s)
Borescope insepctions recently performed without findings
Engine 1
Engine 1 Time
4,584
Engine 2
Engine 2 Time
4,584
Auxiliary Power Unit
APU
Evet
APU Time
6,040
Avionics
ADS-B Equipped
Evet
FANS
Evet
CPDLC
Evet
Avionics/Radios
ADF: Dual
Comm Radios: Triple w/8.33 kHz spacing
CVR: Original Boeing
DME: Dual
FDR: Original Boeing
Flight Director: Single-cue (dual-cue available by Boeing Master Change SB)
FMS: Dual Smith w/alternate navigation system for standby instrument
Hi Frequency: Dual w/SELCAL
Radar Altimeter: Dual
SATCOM: Honeywell MCS-7147 Inmarsat
TAWS: Honeywell Mark V EGPWS w/predictive windshear
TCAS: Yes w/change 7.1
Transponder: Dual
Weather Radar: Multi-scan system V2
Additional Equipment
Wifi
Evet
Additional Equipment
KA Band WI-FI
Exterior
Year Painted
2019
Exterior
Excellent condiiton
Interior
Year Interior
2025
Number of Seats
14
Galley
Evet
Galley Configuration
Forward
Crew Rest
Evet
Crew Rest Configuration
Forward
Lavatory
Evet
Lavatory Configuration
Forward and Aft
Interior
Excellent condiiton, refurbishment completed in 2025
Inspection Status
Inspection Status
C3 (144-month) check (major), landing gear overhaul and engines borescopes completed in January 2025
Airworthy
Evet

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

